3
R1K 34 - RAD - ING - Man.Inst. - 1901.1_firm.L224C_AHS
R1K 34_Man.Ins
t._AHS_EN
TABLE OF CONTENTS
TABLE OF CONTENTS
INTRODUCTION
5
1. INSTALLER SECTION
7
1.1. INSTALLATION
8
1.1.1. GENERAL INSTALLATION WARNINGS
8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS
8
1.1.3. REFERENCE LEGISLATION
9
1.1.4. UNPACKING
10
1.1.5. POSITIONING AND MINIMAL TECHNICAL SPACES
11
1.1.6. OVERALL DIMENSIONS
13
1.1.7. JIG
13
1.1.8. CIRCULATOR PREVALENCE/FLOW DIAGRAM
14
1.1.9. CHECK LIST
15
1.1.10. HYDRAULIC CONNECTION
16
1.1.11. SYSTEM FILLING
17
1.1.12. FILLING THE CONDENSATE COLLECTION SIPHON
18
1.1.13. ANTI-FREEZE PROTECTION
19
1.1.14. GAS CONNECTION
20
1.1.15. ELECTRICAL CONNECTION
20
1.1.16. POWER SUPPLY
21
1.1.17. OPTIONAL ELECTRICAL CONNECTIONS
22
1.1.18. FUME EXHAUST FITTINGS
24
1.1.19. TYPES OF FUME EXHAUST SYSTEMS
26
2. SUPPORT CENTER SECTION
29
2.1. FIRST START-UP
30
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP
30
2.1.2. BOILER COMMISSIONING
31
2.1.3. CO2 VALUE CHECK AND CALIBRATION
32
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS
33
2.1.5. DIGITECH CS PARAMETERS TABLE
35
2.1.6. ELECTRIC FAN FREQUENCY/HEAT CAPACITY DIAGRAM
43
2.2. MAINTENANCE
44
2.2.7. GENERAL MAINTENANCE WARNINGS
44
2.2.8. TECHNICAL DATA
45
2.2.9. TECHNICAL ASSEMBLY
47
2.2.10. HYDRAULIC BOARD
48
2.2.11. WIRING DIAGRAM
49
2.2.12. ACCESSING THE BOILER
50