- 39 -
O
PERATOR
'
S
MANUAL
KORMORAN SF 180 / SF HA 180
9901.00.07EN04SF - 02/2017
6XEMHFWWRWHFKQLFDOPRGL¿FDWLRQV
9.3.2 Lateral
levelling
90°
The 2
nd
pass is made with the tractor in the furrow. The
LPSOHPHQWPXVWEHOHYHOOHGLQWKHODWHUDOOHIWWRULJKWGLUHFWLRQ
The beams must be perpendicular to the ground.
On sloping, tilt the implement to the ploughing side to increase
the pressure applied by the rear the mouldboards to the soil.
2
1
2
Legend
1
Tilt angle adjustment screw HM 30x160 10.9 VI4701
2 Lock
nut
Adjustment
ʈ
$GMXVWWKHOHQJWKRIHDFKRIWKHWLOWDGMXVWPHQWVFUHZV
located beneath the turnover cylinders. The screw heads and
WKHORFNQXWVPXVWEHORFDWHGDERYHWKHPRXOGHGFUDGOH
ʈ
Loosen the lock nut before adjusting the screw length.
ʈ
Re-tighten the lock nut after adjusting the screw length.
IMPORTANT:
The tilt angle must be changed when the ploughing
depth is changed.
9.3.3
Mechanical or hydraulic offset adjustment
(width of 1
st
furrow)
Final adjustment of the width of the 1
st
furrow is correctly made
RQFHWKHPDFKLQHLVOHYHOOHGORQJLWXGLQDOO\DQGODWHUDOO\
ʈ
If the 1
st
body leaves a mound:
-
It is taking too much soil.
-
Reduce its cutting width by changing the travel of the offset
arm.
ʈ
If the 1
st
body leaves a hollow:
-
It is not taking enough soil.
-
Increase its cutting width by changing the travel of the offset
arm.
IMPORTANT:
If the 1
st
plough body takes too much soil, a hollow
PD\DSSHDU7KHPRXOGERDUGLVQRWVXI¿FLHQWO\ORQJ
to cover the furrow. Return the mouldboard to a
normal working position.
IMPORTANT:
On sloping ground, a correction of the width of the
1st furrow may be necessary with each pass to
obtain uniform ploughing.
9.4
Adjusting the hydraulic
compensation cylinder (according to
model)
1
5
4
2
3
2
3
Legend
1
Top link pin
2 Valve
3 Manometer
4 Hydraulic
cylinder
5 Hydraulic
accumulator