background image

3

O

PERATING

& M

AINTENANCE

I

NSTRUCTIONS

:

•  Always disconnect power before performing any work on the ultraviolet disinfection system.
•  Regularly inspect your disinfection system unit to ensure that the UV light is still glowing and that its LED indicator 

is still glowing green.

•  Replace the UV lamp annually ( or biennially if seasonal cottage use) to ensure a high bacteria and virus kill 

rate.

•  Always drain the UV cell when closing a cottage or leaving the unit in an area subject to freezing 

temperatures.

A.  UV LAMP REPLACEMENT:

To replace the lamp, there is NO need to disconnect the system from the water supply, nor to drain the water from
the reactor chamber. Lamp replacement is a quick and simple procedure requiring no special tools. The UV lamp must
be replaced after 9,000 hours of continuous operation (approximately one year) in order to ensure adequate 
disinfection. 

S12Q, S12Q-GOLD, S24Q, and S24Q-GOLD

1. 

Disconnect main power source and allow the unit to power down. Remove the lamp connector by sliding the 

metal retaining ring away from the body of the connector. Remove connector and lamp from the reactor chamber. 
Separate the lamp from the connector.  Do not twist the lamp from the connector, simply slide the two apart. 
Avoid touching the lamp on the glass portion.  Handling the lamp at the ceramic ends is acceptable, however if 
you must touch the lamp glass, please use gloves, or a soft cloth. Fully remove the lamp from the reactor chamber 
being careful not to angle the lamp as it is removed from the chamber.  If the lamp is removed on an angle, 
pressure will be applied on the inside of the quartz sleeve, causing the sleeve to fracture.

2

.  To install a new lamp, first remove the lamp from its protective packaging, again being careful not to touch the 

lamp glass itself. Carefully insert the lamp into the reactor vessel (actually inside the quartz sleeve). Insert the lamp 
fully into the chamber leaving about two inches of the lamp protruding from the chamber. Next, attach the 
connector to the UV lamp. The connector is “keyed” and will only allow correct installation in one position. Ensure 
the connector is fully seated onto the UV lamp.

3

.  Once the lamp is fully seated on the connector, slide the connector over the aluminum retaining nut.  Make sure 

the metal retaining ring on the connector is pulled away from the body of the connector in order that the 
connector may slide fully over the retaining nut. Once the connector is located fully over the retaining nut, slide 
the metal ring back in to lock the connector in place. As this connector is keyed to the reactor chamber, make sure 
the depression on the connector is located over the ground lug located on the reactor chamber.

S40Q

1

.  Disconnect main power source. Remove lamp connector from gland nut (with the aid of a slot screwdriver) and 

carefully slide UV lamp slightly out of chamber. Remove lamp connector from lamp and fully remove lamp (be 
extremely careful when handling UV lamp as they are extremely fragile).

2.

To install the new lamp, carefully remove from protective tube being careful not to touch the lamp “glass” with 

your hands. Slide UV lamp into the reactor chamber. Affix lamp connector to the UV lamp, slide  lamp fully into 
cell, press fit lamp connector into aluminum gland nut (a light application of silicone lubricant will assist this 
operation).

B.  QUARTZ SLEEVE REPLACEMENT AND/OR CLEANING:

If the water contains any hardness minerals (calcium or magnesium), iron or manganese, the quartz sleeve will require
periodic cleaning. To remove the quartz sleeve, first remove the UV lamp as outlined above:

a) Shut off water supply and drain all lines.
b) Drain the UV chamber (use a small bucket under the unit to prevent a spill), using drain port provided.
c) Remove aluminum gland nuts from chamber, checking for the  free floating spring inside sleeve at the 

opposite end to the lamp connection (do not allow quartz sleeve to fall).

d) Carefully remove o-rings from the quartz sleeve. As the o-ring may tend to adhere to the quartz sleeve, it is

recommended to replace the o-rings annually.

e) Clean the quartz sleeve with a cloth soaked in CLR, vinegar or some other mild acid and then rinse, 

avoiding the introduction of any water to the inside of the sleeve.

Summary of Contents for Sterilight S12Q

Page 1: ...er s Manual P N 520022 October 2004 425 Clair Road West P O Box 1719 Guelph ON N1H 7X4 Canada t 519 763 1032 f 519 763 5069 t f 1 800 265 7246 e water r can com i www r can com S12Q S12Q GOLD S24Q S24...

Page 2: ...Chemistry Page 2 Installing Your Disinfection System Page 2 Operating Maintenance Instructions Page 3 4 Warning Systems Page 4 5 Warranty Page 5 Troubleshooting Page 6 8 Parts Page 9 Specifications P...

Page 3: ...temperatures below freezing Do not store this disinfection system where it will be exposed to the weather Do not store this disinfection system where it will be exposed to temperatures below freezing...

Page 4: ...nnections are made slowly turn on the water supply and check for leaks The most likely cause for leaks is from the o ring seal In case of a leak shut water off drain cell remove the retainer nut wipe...

Page 5: ...The connector is keyed and will only allow correct installation in one position Ensure the connector is fully seated onto the UV lamp 3 Once the lamp is fully seated on the connector slide the connect...

Page 6: ...tection by constantly sensing the UV INTENSITY at the inside surface of the cell The system features a single LED indicator light which will show three distinct colours GREEN YELLOW and RED When the U...

Page 7: ...cable for remote monitoring of the audible and visual signals provided by the UV monitoring mechanism THIS ADVANCED WARNING SYSTEM HAS BEEN INSTALLED TO PROVIDE YOU WITH THE OPTIMUM PRECAUTIONS TO EN...

Page 8: ...the disinfection system it is imperative that the effluent water stream be shocked with chlorine after the water leaves the disinfection system the disinfection system must have a bacteria free distr...

Page 9: ...ALARM UV LAMP ON ON OFF ON Correct operating conditions unit is functioning properly OFF OFF OFF OFF The unit is not plugged into the electrical outlet Plug unit into receptacle and ensure proper powe...

Page 10: ...acturer replacement Always Wet Sensor Lens prior to inserting sensor check water quality see page 2 for water parameters RED ON ON UV Sensor has not detected enough UV Intensity to adequately protect...

Page 11: ...IRCUIT BOARD for 115V unit CB 2440A 2 CIRCUIT BOARD for 230V unit RN 001 ALUMINUM RETAINING NUT CP 1240 CIRCUIT BOARD COVER CS 001 Q CORD SET 115V CS EU Q EUROPEAN SCHUKO CORD SET 230V DP750 RETAINING...

Page 12: ...ER CONSUMPTION 42 W 42 W 95 W 95 W 190 W TOTAL LAMP WATTS 39 W 39 W 78 W 78 W 156 W MAXIMUM OPERATING PRESSURE 8 62 bar 125 psi 8 62 bar 125 psi 8 62 bar 125 psi 8 62 bar 125 psi 8 62 bar 125 psi AMBI...

Page 13: ...N 520022 octobre 2004 425 chemin Clair ouest C P 1719 Guelph ON N1H 7X4 Canada t l 519 763 1032 s f 1 800 265 7246 t l c 519 763 5069 courriel water r can com site Internet www r can com EPA 57987 CN...

Page 14: ...miques de l eau Page 2 L installation de votre syst me de d sinfection Page 2 Directives d utilisation et d entretien Page 3 4 Syst mes d advertissement Page 4 5 Garantie Page 5 Diagnostic Page 6 8 Co...

Page 15: ...toujours l alimentation d eau d un syst me de d sinfection et sa prise lectrique avant de commencer son nettoyage ou son entretien Ne tirez jamais sur le cordon pour le d brancher de la prise murale...

Page 16: ...ntenue dans le compartiment se r chauffe s il n y a pas d coulement Pour rem dier cette situation laisser couler pendant une minute un robinet d eau froide de la maison Vous vacuerez ainsi l eau chaud...

Page 17: ...est bien cal sur la lampe UV 3 D s que la lampe est bien fix e au connecteur glissez le sur l crou de retenue en aluminium Assurez vous que la bague m tallique de retenue du connecteur n emp che pas c...

Page 18: ...OUR VOUS PROCURER UNE PROTECTION OPTIMALE CONTRE LA CONTAMINATION MICROBIOLOGIQUE DE VOTRE EAU NE N GLIGEZ PAS LES AVERTISSEMENTS LUMINEUX LA MEILLEURE FA ON DE V RIFIER LE BON FONCTIONNEMENT DE VOTRE...

Page 19: ...otre d taillant Cette vanne sol no de qui est normalement ferm fonctionne en parall le avec le syst me de contr le UV pour arr ter l coulement de l eau si le capteur UV d tecte qu elle n est pas trait...

Page 20: ...d utilisation de cet appareil Contamination apr s le syst me de d sinfection Il est imp ratif que l eau effluente re oive un traitement de choc au chlore apr s que l eau quitte le syst me de d sinfec...

Page 21: ...M E TEINTE ALLUM E Conditions de fonctionnement correctes l appareil fonctionne correctement TEINTE TEINTE TEINTE TEINTE L indicateur est DEL a br l ou le fil d amen e est cass Remplacez la DEL L appa...

Page 22: ...llez toujours la lentille du d tecteur avant de l ins rer V rifier la qualit de l eau voir les param tres la page 2 ROUGE ALLUM E ALLUM E Le d tecteur UV n a pas d tect une intensit UV suffisante pour...

Page 23: ...V UNIT CB 2440A 2 CARTE DE CIRCUIT FOR 230V UNIT RN 001 CROU DE RETENUE CP 1240 COUVERCLE DE LA CARTE DE CIRCUIT CS 001 Q CORDON D ALIMENTATION 120V CS EU Q CORDON D ALIMENTATION EUROP EN 230V DP750 B...

Page 24: ...SSANCE DE LA LAMPE 39 W 39 W 78 W 78 W 156 W PRESSION MAXIMUM D OP RATION 8 62 bar 12 lb po2 8 62 bar 125 psi 8 62 bar 125 psi 8 62 bar 125 psi 8 62 bar 125 psi TEMP RATURE AMBIANTE 2 40 C 36 104 F 2...

Reviews: