
5.3
Starting
Control panel
Description
Step
Action
-
At least 10 minutes before starting, the main supply to the dryer must be switched on to
initialize the controller and flow switch.
-
Close the dryer by-pass valve, if installed.
-
For water-cooled versions: Open the water inlet and outlet valves (customer's
installation).
Press start button (14).
-
Open the dryer air inlet valve (customer's installation).
-
Approx. 5 minutes later, open the dryer air outlet valve (customer's installation).
-
Approx. 10 minutes later, the nominal dew-point will be reached.
5.4
During operation
Control panel
Instruction book
100
2920 1992 00
Summary of Contents for QED-1250
Page 2: ......
Page 6: ...8 2 AIR DRYER DATA 108 9 Pressure equipment directives 112 Instruction book 4 2920 1992 00 ...
Page 15: ...Position of components Air cooled dryer Water cooled dryer Instruction book 2920 1992 00 13 ...
Page 17: ...Connections Rear view of Air cooled dryer Instruction book 2920 1992 00 15 ...
Page 31: ...Electrical diagram air cooled QED 1800 ES870 Instruction book 2920 1992 00 29 ...
Page 32: ...Electrical diagram air cooled QED 2100 ES1010 Instruction book 30 2920 1992 00 ...
Page 36: ...Electric cubicle air cooled QED 2100 ES1010 380 V and 460 V Instruction book 34 2920 1992 00 ...
Page 86: ...Dimension drawing air cooled QED 1600 ES760 Instruction book 84 2920 1992 00 ...
Page 87: ...Dimension drawing air cooled QED 1800 ES870 Instruction book 2920 1992 00 85 ...
Page 88: ...Dimension drawing air cooled QED 2100 ES1010 Instruction book 86 2920 1992 00 ...
Page 89: ...Dimension drawing water cooled QED 1250 ES610 Instruction book 2920 1992 00 87 ...
Page 90: ...Dimension drawing water cooled QED 1600 ES760 Instruction book 88 2920 1992 00 ...
Page 91: ...Dimension drawing water cooled QED 1800 ES870 Instruction book 2920 1992 00 89 ...
Page 95: ...Installation proposal water cooled dryer Instruction book 2920 1992 00 93 ...
Page 115: ......
Page 116: ...No 2920 1992 00 2021 05 ...