INSTALLATION MANUAL
T
ouch
BOILING
CHILLED
SPARKLING
HOT & COLD
220V/50Hz
Page 1: ...INSTALLATION MANUAL Touch BOILING CHILLED SPARKLING HOT COLD 220V 50Hz...
Page 2: ...PRE INSTALLATION CHECKLIST 2 UNPACKING YOUR EQUIPMENT 3 INSTALLING QUATREAU TAP 3 4 CONNECTING YOUR TAP 5 6 INSTALLING THE QT553 6 INSTALLING THE CS20 7 TECHNICAL DETAILS 8 RE SANITATION AND FILTER C...
Page 3: ...tallation kit and put on a flat surface where it cannot be damaged accidentally STEP 2 Remove and inspect QT553 On top of the QT553 you will see two protruding opaque stems be careful not to damage th...
Page 4: ...sk what type of cutting tool can be used Decide where the tap is going to sit Note that the control panel is on the right hand side of the tap Ensure that the location you choose is suitable and that...
Page 5: ...ould be in stantly achieved with the push fittings it s im portant to observe and listen for any water es caping Now connect the cold water feed to the right hand side of the QT553 using the 1 4 6 35m...
Page 6: ...at tached inside by unscrewing the plastic rim 5 Refit the housing to the system and activate the water supply 6 Run the water through the boiling chilled and sparkling function until you can smell c...
Page 7: ...tight the stain less steel housing 12 Ideally you will leave the chlorine in the chiller unit for a good 15 minutes before flushing through 13 When ready turn off the water supply back on and run off...