background image

you choose is suitable and that you can 
reach the controls without needing to 
stretch.

We typically set back approximately 
50mm from the back edge of the sink. 
Your kitchen design will of course dictate 
whether this is possible. Before you start 
cutting ensure that you have set up a jig 
or a template device to prevent the drill 
bit moving when you start the cut.

Once the hole is prepared, remove any 
rough edges or bits of wood and place 
the tap carefully into the hole ensuring 
that the comms cable is dropped into the 
hole first to prevent damage.

Using the washer and fixing bracket 
provided, you can now fix the tap in 
place underneath the work surface.

Take care to locate the comms cable into 
the groove behind the tap base then slide 
the washer up over the base followed by 
the fixing bracket. This will screw onto the 
thread on the tap base.

Ensure that the comms cable is recessed 
into the cable channel to avoid 
damaging it as you spin the bracket 
clockwise until it is almost at the top of the 
thread.

At each side of the fixing bracket you will 
see a threaded hole. Using the two bolts 
provided thread up into these holes until 
tight against the washer above. With a 
flat head screw driver, tighten each one 
gently.

Now position the tap so that the control 
panel faces forward towards the user 
position (180 degrees to the sink). Now you 

can tighten the nuts until you have a firm 
fixing on both sides.

The comms cable hangs down and will 
connect into the QT553-B unit when it is 
installed. It’s essential that the QT553-B 
is located close to this cable without 
causing it to stretch

————————————————————
QUATREAU TOUCH 
CONNNECTING YOUR TAP
————————————————————

Once the faucet is in position you are now 
ready to connect the tap to the QT553-B.
1.  Remove the end cap from thefront 

manifold stem. If unsure how to 
remove this fittingplease refer to 
https://www.johnguest.com/speedfit/
product/cts-jg-twist-lock-fittings/end-
cap/ or search online for John Guest 
push fit end cap removal. 

2.  You will find 2 lengths of silicon pipe in 

the fitting kit, one pre asembled with 
a VenturiT piece. The longer section 
connects to the front outlet on top 
of the boiler control unit whilst the 
shortest pipe fits onto the underside 
of the tap base (on the right hand 
connecting stem). Fix in place using 
the spring loaded clips included in 
the fitting kit. 

3.  The rear manifold stem is the mains 

hot and cold water. This connects 
to the left hand stem of the tap as 
you look at it inside the cupboard. 
This is one continuous run from boiler 
control unit to the tap. It doesn’t need 
a drain off device.

4.  The boiling, chilled and sparkling 

supply must have the Venturi T 
included (see diagram). The Venturi T 
requires a Type AA drain connection 
in accordance with your local 
plumbing code.

INSTALL ATION

Summary of Contents for PureH2O Touch

Page 1: ...BOILING CHILLED SPARKLING HOT COLD Touch INSTALLATION GUIDE...

Page 2: ...PRE INSTALLATION CHECK LIST 3 TYPE AA AIR GAP 4 INSTALLATION 5 UNPACKING YOUR EQUIPMENT 5 INSTALLING THE QUATREAU TOUCH TAP 5 INSTALLING THE QT553 B boiler control module 7 INSTALLING THE CS20 8 IMPO...

Page 3: ...ed Mains Cold Water that will be used to feed a cold supply to the system 4 Drainage An approved Type AA fitting air gap must be used for the Venturi waste Either a trapped upstand or drain clamp can...

Page 4: ...le water device The interconnection pipe must run downhill as shown here into the Airgap connection Stage 2 provides a secondary non return valve in the grey adaptor whilst stage 2 provides an air gap...

Page 5: ...and electrical connection that will be in a plastic bag inside the packing A contents list will explain what should be included and what the parts are used for PRIOR TO INSTALLATION WE RECOMMEND THAT...

Page 6: ...nel faces forward towards the user position 180 degrees to the sink Now you can tighten the nuts until you have a firm fixing on both sides The comms cable hangs down and will connect into the QT553 B...

Page 7: ...ust flow for mains hot and cold if the thermostatic valve is out of reach This will control the cold water mains feed that is fitted to the left rear low level fitting labeled cold mains inlet It will...

Page 8: ...he boiler unit at the back Push gently until it clicks in Connect the power lead but do not turn on at this stage QUATREAU TOUCH INSTALLING THE CS20 Before installation of the chiller unit refer to th...

Page 9: ...ontrol unit 3 Install Thermostatic mixing valve and set to maximum temperature then reduce by 1 2 turn for 40C set point Connect the hot and cold feeds with isolators 4 Install Drain off saddle with t...

Reviews: