background image

————————————————————
SECTION ONE
UNPACKING YOUR EQUIPMENT
————————————————————

Your system has been carefully 
packaged. If the box is damaged upon 
delivery you should photograph the 
damage and remove the contents for 
inspection before signing the delivery 
note.

STEP 1

 

The systems comes in 3 separate boxes; 
the TouchTap, the QT553-B (boiler control 
unit) and the CS20/50 Chiller Carbonator.

STEP 2

Remove and inspect Q553-B 

On top of the QT553-B you see two 
protruding opaque stems, be careful not 
to damage these outlets. The unit weighs 
18Kg so ensure you use the correct lifting 
procedure

Cut down each side of the box to reveal 
the system so that you don’t have to lift it 
upwards, out of the box. Carefully place 
one hand under the front lip of the system 
at the top of the filters, this will give you a 
firm hold and leverage.

Tilting the system away from you, place 
your other hand under the base of the 
opposite end. This will ensure you have 
control of the weight when you lift. 
Remove from box and place in on the 
floor.

————————————————————

WARNING: THE EDGES ARE HARD 
STAINLESS STEEL AND CAN DAMAGE 
CUPBOARD DOORS OR FURNITURE, 
HANDLE WITH CARE.

————————————————————

STEP 3

Check the installation equipment and 
electrical connection that will be in a 
plastic bag inside the packing. A contents 
list will explain what should be included 
and what the parts are used for.

————————————————————

PRIOR TO INSTALLATION WE RECOMMEND 
THAT YOU REVIEW THE PRE-INSTALLATION 
GUIDE AND STUDY THE INSTALLATION 
NOTES ON FINAL PAGE BEFORE YOU START. 
THIS PROVIDES ALL THE INFORMATION 
REQUIRED FOR A SUCCESSFUL 
INSTALLATION. IF YOU DO NOT HAVE THIS 
PLEASE REQUEST IT FROM YOUR SUPPLIER.

————————————————————
SECTION TWO
INSTALLING THE QUATREAU TAP
————————————————————

The boiler control unit (QT553-B) and 
chiller carbonator (CS20) must be located 
underneath the faucet or in an adjacent 
cupboard no further than 1mtr from the 
TouchTap location. This is to ensure the 
communication cable from the faucet to 
the QT553-B is not stretched.

1. INSTALLING THE QUATREAU TOUCH™

The Touch requires a 40mm hole cut into 
the surface behind the sink or drainer it is 
going to be used with.

Depending upon the surface you may 
need special cutting equipment. For 
granite or marble a diamond tipped 
core bit will be required. For wood, MDF 
or polymer type material a wood bit will 
normally be adequate. Always check with 
the work surface manufacturer and ask 
what type of cutting tool can be used.

Decide where the tap is going to sit. Note 
that the control panel is on the right-hand 
side of the tap. Ensure that the location 

INSTALL ATION

Summary of Contents for PureH2O Touch

Page 1: ...BOILING CHILLED SPARKLING HOT COLD Touch INSTALLATION GUIDE...

Page 2: ...PRE INSTALLATION CHECK LIST 3 TYPE AA AIR GAP 4 INSTALLATION 5 UNPACKING YOUR EQUIPMENT 5 INSTALLING THE QUATREAU TOUCH TAP 5 INSTALLING THE QT553 B boiler control module 7 INSTALLING THE CS20 8 IMPO...

Page 3: ...ed Mains Cold Water that will be used to feed a cold supply to the system 4 Drainage An approved Type AA fitting air gap must be used for the Venturi waste Either a trapped upstand or drain clamp can...

Page 4: ...le water device The interconnection pipe must run downhill as shown here into the Airgap connection Stage 2 provides a secondary non return valve in the grey adaptor whilst stage 2 provides an air gap...

Page 5: ...and electrical connection that will be in a plastic bag inside the packing A contents list will explain what should be included and what the parts are used for PRIOR TO INSTALLATION WE RECOMMEND THAT...

Page 6: ...nel faces forward towards the user position 180 degrees to the sink Now you can tighten the nuts until you have a firm fixing on both sides The comms cable hangs down and will connect into the QT553 B...

Page 7: ...ust flow for mains hot and cold if the thermostatic valve is out of reach This will control the cold water mains feed that is fitted to the left rear low level fitting labeled cold mains inlet It will...

Page 8: ...he boiler unit at the back Push gently until it clicks in Connect the power lead but do not turn on at this stage QUATREAU TOUCH INSTALLING THE CS20 Before installation of the chiller unit refer to th...

Page 9: ...ontrol unit 3 Install Thermostatic mixing valve and set to maximum temperature then reduce by 1 2 turn for 40C set point Connect the hot and cold feeds with isolators 4 Install Drain off saddle with t...

Reviews: