EazyRizer Assembly Instructions (09/01)
Page - 5-
the screw shaft protrudes below the bottom pillar flange hole.
Step 15:
Final assembly: Position the following components under the lower
pillar flange in this order: White nylon guide with large flange side
down, “small” rubber bushing, washer and finally the cotter pin. Split and bend the two cotter pin tabs around
the screw thread. Rotate the screw shaft to make sure you have provided sufficient room for the cotter pin
without interference.
NOW, grease the entire screw thread shaft as well as the
top ball bearing assembly with the supplied (LM) grease.
This grease has been throughly tested and will provide a
lifetime of service with regular maintenance. If you run out
of the supplied grease, you may substitute with a high
quality general purpose wheel bearing grease, only. At the
same time, we recommend that you apply a thin coat of a
high quality car wax / cleaner to the four painted surfaces
of the vertical pillar and polish with a clean dry cloth. This
will help the movement of the sliders up and down the
pillar. You could also use the supplied grease but this may
prove to be a little messy.
Congratulations, you have successfully finished assembling
your new EazyRizer lift. Your lift has been extensively
tested meeting the highest quality control and design
standards. All components have been manufactured using
high precision laser cutting technology and “state of the
art” welding techniques. This product has been designed
and manufactured to provide you with a lifetime of service.
To provide a lifetime of service it is essential that you
regularly clean and lubricate your EazyRizer lift.
A word of caution. Lifting your bike the first 10 to 15 times may take a little extra drill power to raise your bike
all the way to the top. Don’t be alarmed as it will get easier. There is a slight break in period whereby the screw
shaft and the bronze lifting bushing conform to each other. After the initial break-in period, re-grease and re-
apply the car wax / polish as stated above. Thereafter repeat this process every 15 lifts or more often as
needed.
- - - - -