background image

INSTALLATION INSTRUCTIONS     

ATTIC PROTECTION

Quarrix.com  

 800.438.2920

6

1. Ridge Ventilation Slot Preparation

Cut the slot prior to installing the last course of shingle panels along the 
ridge in a re-roof or new construction application (protective eye goggles 
should be worn during this process). For 

5

8

” profile 7” wide vents, cut a 2” slot 

(1” on each side of ridge) along the ridge. A minimum of 6” must be left uncut 
on each end of the ridge. Once the slot is cut then measure and cut shingle 
panels to fit along the ridge; panels should not obstruct the slot. Once the 
panels are installed, the ridge is ready for vent installation.

Retrofit  with  Stone-Coated  Steel

 

If  stone-coated  steel  is  already  installed, 

the  slot  can  be  cut  from  the  pre-paneled  roof  using  a  circular  saw 
with  a  combination  blade  (reversed)  or  a  Tenryu  Steel  Pro  blade 
(protective  eye  goggles  should  be  worn  during  this  process).  For 

5

8

” 

profile  7”  wide  vents,  cut  a  2”  slot  (1”  on  each  side  of  ridge)  along  the 
ridge.  A  minimum  of  6”  must  be  left  uncut  on  each  end  of  the  ridge. 

2. End Cap Installation

Pull  apart  a  precut  section  of  the  foam  end  cap  found  with  the  vent, 
usually found in the first 3 feet of the roll. Use a utility knife to make a cut in 
the StormStop material 1⁄2” on each side, back from the end of the section 
(See insets). Using construction adhesive or sealant caulk, coat both sides 
of the StormStop material where it has been cut back at the end of the  
vent.  Insert  the  foam  end  cap  with  the  cut-back  StormStop  material 
between  the  foam  end  cap  and  the  underside  of  the  vent  to  assure  a 
weather-tight seal.

3. Vent Placement on Ridge

Before  installing  the  vent  on  the  ridge  a  bead  of  sealant  is  required 
between  the  stone-coated  steel  and  the  underside  of  the  ridge  vent. 
This sealant should fill any voids between the bottom of the vent and the 
surface of the panel. Caulking and sealants shall be suitable for exterior use 
and be resistant to weathering; use either butyl or polyurethane sealants. 
The  caulking  and  the  sealants  shall  be  compatible  with  and  adhere  to 
the  materials  to  which  they  are  applied.  Check  sealant  manufacturer’s 
instructions  and  stone  coated  steel’s  installation  guide  for  compatibility. 
Roll  out  or  place  ridge  vent  along  the  entire  length  of  slot  also 
covering  the  6”  minimum  uncut  ridge  on  both  ends.  When  using 

StormStop

  products,  secure  at  the  lead  edge,  inserting  the  end  cap. 

Pull  the  vent  tight  and  secure  at  about  10  feet.  Pull  the  rest  of  the  vent 
tight and secure, inserting  the  end  cap.  Multiple  lengths  of  vent  can  be 
joined  by  butting  the  sections  tightly  together.  An  end  cap  should  be 
inserted at the end of  each section. 

SteelRoofs

STONE-COATED

1

2

Sealant

or Caulk

3

INST-SSRV01.0

2

.0

4

.21

         

Distributed by Best Materials® LLC

http://www.bestmaterials.com      |      1-800-474-757

0

[email protected]    |      

http://www.bestmaterials.com      |      1-800-474-7570

     [email protected]    |      http://www.bestmaterials.com      |      1-800-474-7570

http://www.bestmaterials.com      |      1-800-474-757

0

[email protected]    |      

http://www.bestmaterials.com      |      1-800-474-7570

      [email protected]    |      http://www.bestmaterials.com      |      1-800-474-7570

Summary of Contents for StormStop

Page 1: ...ications a 4 slot should be cut 2 on each side of ridge Aminimumof6 mustbeleftuncutoneachendof theridge Oncetheslotiscutandanyoverlapping shingles covering the ridge are trimmed and removed the ridge is ready for vent installation The amount of ventilation is controlled by the length of slot cut along the roof ridge For the most attractive roofline it is recommended that Quarrix StormStop Ridge Ve...

Page 2: ...the roof shingles before installing the vent on the ridge This sealant should fill any voids between the bottom of the vent and the surface of the shingle UseeitherbutylsealantconformingtoASTMC1085 latex sealant conforming to ASTM C834 silicone sealant complying with ASTM C920 or asphalt roofing cement complying with ASTM D4586 Roll out or place Quarrix Ridge Vent along the entire length of slot a...

Page 3: ... has been installed properly if the bottom of the vent is flat on the roof and the peak is slightly rounded Description consult oretimi linam Verehena non tam reste non tus is Quarrix com 800 438 2920 INSTALLATION INSTRUCTIONS ATTIC PROTECTION Using One Pass Installation secure cap shingles and vent at the same time Nail ridge caps with roofing nails in a common overlapping pattern Nails should pe...

Page 4: ... end of the section Using construction adhesive or sealant caulk coat both sides of the StormStop material where it has been cut back at the end of the vent Insert the foam end cap with the cut back StormStop material between the foam end cap and the underside of the vent to assure a weather tight seal Because of the popularity of dimensional roofing material such as 40 50 year and lifetime lamina...

Page 5: ...This createsthemostattractiveridgeandhipline Insertthefoamendcapunder the ridge vent where it is at full width Fasten vent for hip at point where it meets ridge Roll out or place the vent all of the way down the hip covering 2 pre laid cap shingles at the bottom of the hip Go back over hip vents and fasten at 4 intervals If the vent is not being run the entire length of the hip use the cap shingle...

Page 6: ...e foam end cap with the cut back StormStop material between the foam end cap and the underside of the vent to assure a weather tight seal 3 Vent Placement on Ridge Before installing the vent on the ridge a bead of sealant is required between the stone coated steel and the underside of the ridge vent This sealant should fill any voids between the bottom of the vent and the surface of the panel Caul...

Page 7: ...bottom of the vent is flat on the roof and the peak is slightly rounded Install hip ridge caps per manufacturer s installation guide Each hip ridge piece should clip together by inserting the return at the nose of each piece into the back clip which is located at the top of the hip ridge cap section Fasten cap to vent through thebackclipusing 8screws Fastenersshouldpenetratethroughthewood roof dec...

Page 8: ...e it has been cut back at the end of the vent Insert the foam end cap with the cut back StormStop material between the foam end cap and the underside of the vent to assure a weather tight seal 3 Vent Placement on Ridge Beforeinstallingtheventontheridge abeadofsealantisrequiredbetween the roof tile and the under side of the ridge vent This sealant should fill any voids between the bottom of the ven...

Page 9: ...anner meet the requirement for weather blocking according to Concrete and Clay Roof Tile Design Criteria Installation Manual for Moderate Climate Regions ICBO ER 6034P 4 FlatTile ROOFS INST SSRV01 02 04 21 Distributed by Best Materials LLC http www bestmaterials com 1 800 474 757 0 sales bestmaterials com http www bestmaterials com 1 800 474 757 0 sales bestmaterials com http www bestmaterials com...

Page 10: ...r An end cap should be inserted at the end of each section Note For Class A Installation Only For Class A Quarrix vent installation follow steps 1 2 3 as stated above Once the vent has been installed use a utility knife with a hook blade and remove the corrugated plastic center section of the vent Do this for the hip and ridge This modified installation meets the requirements for UL790 Class A sta...

Page 11: ...intain the pitch of the roof SHINGLE ROOFS Cedar Shake INST SSRV01 02 04 21 Distributed by Best Materials LLC http www bestmaterials com 1 800 474 757 0 sales bestmaterials com http www bestmaterials com 1 800 474 757 0 sales bestmaterials com http www bestmaterials com 1 800 474 7570 http www bestmaterials com 1 800 474 757 0 sales bestmaterials com http www bestmaterials com 1 800 474 757 0 sale...

Page 12: ...p material between the foam end cap and the underside of the vent to assure a weather tight seal 3 Vent Placement on Ridge Beforeinstallingtheridgevent abeadofsealantisrequiredbetweenthemetalorfoamclosureand theundersideofthevent fillinganyvoids Caulkingandsealantsshallbesuitableforexterioruseand beresistanttoweathering useeitherbutylorpolyurethanesealants Thecaulkingandthesealants shall be compat...

Page 13: ...e cap over Quarrix Ridge Vent according to metal manufacturer s installation instructions Metal Roofs INST SSRV01 02 04 21 Distributed by Best Materials LLC http www bestmaterials com 1 800 474 757 0 sales bestmaterials com http www bestmaterials com 1 800 474 757 0 sales bestmaterials com http www bestmaterials com 1 800 474 7570 http www bestmaterials com 1 800 474 757 0 sales bestmaterials com ...

Reviews: