INSTALLATION INSTRUCTIONS
ATTIC PROTECTION
Quarrix.com
|
800.438.2920
11
4. Cap Shake Installation
Secure shake caps and vent at the same time using a nail that should penetrate the wood roof
deck at least
3
⁄
4
”. It is important when installing this vent that you maintain the pitch of the roof.
& SHINGLE ROOFS
Cedar Shake
INST-SSRV01.0
2
.0
4.
21
Distributed by Best Materials® LLC
http://www.bestmaterials.com | 1-800-474-757
http://www.bestmaterials.com | 1-800-474-7570
[email protected] | http://www.bestmaterials.com | 1-800-474-7570
http://www.bestmaterials.com | 1-800-474-757
http://www.bestmaterials.com | 1-800-474-7570
[email protected] | http://www.bestmaterials.com | 1-800-474-7570