Selecting an Installation Location

Selecting an Installation Location

1

When selecting an installation location for the library, consider the 
following:

floor space

overhead clearance

installation surface strength and inclination

power and grounding

environmental specifications

Floor Space

1

Figure 2 shows the floor space requirements for setting up and 
operating the desktop and rack-mount library.

Figure 2   Floor Space 
Requirements 

The width of the desktop library is 8.9 inches (22.5 cm).  The width of 
the rack-mount library is 8.6 inches (21.9 cm).  The depth of both 
library versions is 22.8 inches (57.8 cm).

Overhead Clearance

2

The height of the stand-alone library is 7.6 inches (19.4 cm). The height 
of the rack-mount library is 6.9 inches (17.5 cm).

To remove and replace the library enclosure, you need an overhead 
clearance slightly greater than the height of the library.

8.9 inches

22.8 inches

Front

Back

(22.5 cm)

(57.8 cm)

8.6 inches

(21.9 cm)

Desktop

Rack-
mount

Summary of Contents for PowerStor L200

Page 1: ...rpose 3 Library Configurations 3 Selecting an Installation Location 4 Floor Space 4 Overhead Clearance 4 Surface Strength and Inclination 5 Power and Grounding 5 Environmental Specifications 5 Unpacki...

Page 2: ...ATL PowerStor L200 Series Library Unpacking Instructions Document 6322502 01 Ver 1 Rel 0 February 1999 2...

Page 3: ...e drive and eight DLTtape cartridges see figure 1 This document explains how to unpack the L200 Series library properly Once the library is unpacked and moved to the desired installation location set...

Page 4: ...uirements for setting up and operating the desktop and rack mount library Figure 2 Floor Space Requirements The width of the desktop library is 8 9 inches 22 5 cm The width of the rack mount library i...

Page 5: ...rounding 2 The electrical ratings for the library are 100 to 120 200 to 240 VAC 50 60 Hertz Environmental Specifications 2 The installation location should meet the following environmental specificati...

Page 6: ...ack mount kit To unpack and install the rack mount library you must Uncrate the rack mount kit and verify its contents see Uncrating the Rack Mount Kit Install the rack mount kit in the rack see Insta...

Page 7: ...the shipping carton to the pallet see figure 3 2 Lift the carton off of the pallet Caution The library weighs 37 lbs 16 8 kg Two people should perform any procedure that involves lifting or moving th...

Page 8: ...ng the Accessories Boxes Procedure continued 5 Remove the packing foam from the top of the library see figure 5 6 With two people lifting the library remove it from the shipping carton 7 Remove the li...

Page 9: ...ebruary 1999 Unpacking the Library 9 Figure 5 Removing the Library from the Shipping Carton The library is now unpacked Refer to the ATL PowerStor L200 Series Library User s Guide for information abou...

Reviews: