background image

Document 6434006-02, Ver. 2, Rel. 0, August 2002

1

Quantum ATL P7000

Unpacking Instructions

Introduction

3

Selecting an Installation Location

4

Floor Space .....................................................................................................4
Floor Clearance ..............................................................................................4
Floor Strength and Inclination.....................................................................5
Power and Grounding..................................................................................5
Environmental Conditions...........................................................................6

Preparing for the Installation

6

Providing Necessary Tools and Equipment..............................................6
Taking ESD Precautions ...............................................................................6

Unpacking the Library

7

Receiving the Library....................................................................................7
Unboxing the Library ...................................................................................8
Positioning the Library...............................................................................13
Unpacking the Library................................................................................16
Storing the Shipping Materials..................................................................20
Leveling the Library....................................................................................21

Summary of Contents for P7000 Series

Page 1: ...e 4 Floor Strength and Inclination 5 Power and Grounding 5 Environmental Conditions 6 Preparing for the Installation 6 Providing Necessary Tools and Equipment 6 Taking ESD Precautions 6 Unpacking the...

Page 2: ...Quantum ATL P7000 Unpacking Instructions Document 6434006 02 Ver 2 Rel 0 August 2002 2 6207947 04fN 11...

Page 3: ...val library consisting of up to 16 tape drives and up to 679 digital linear tape DLT cartridges see figure 1 This document explains how to unpack the ATL P7000 Once the library is unpacked and moved t...

Page 4: ...lination Power and grounding Environmental conditions These requirements are also described in the Quantum ATL P4000 and ATL P7000 Tape Libraries User s Guide Floor Space 0 Figure 2 shows the minimum...

Page 5: ...1600W The library power requirements may require modification of the facilities existing power capabilities by a qualified electrician The required wall outlet for the United States and Canada is rat...

Page 6: ...Providing Necessary Tools and Equipment 0 Provide the following tools for unpacking the library Scissors Ratchet with 15 16 inch socket or 15 16 inch open end wrench Provide the following tools for re...

Page 7: ...it to its final installation location The ATL P7000 is shipped in packing materials designed to protect it from damage during transit By following these instructions you help ensure that the library...

Page 8: ...erial to the pallet see figure 6 Note Uncrating the library requires a minimum of 3 feet 91 cm on all sides For the side being used for the ramp uncrating the library requires an additional 7 feet 2 1...

Page 9: ...the Library 9 Figure 6 Removing the Steel Bands 4 Lift the cardboard box top cover straight up and off of the pallet see figure 7 Figure 7 Removing the Box Top Cover 5 Pull the eight cardboard box re...

Page 10: ...Figure 8 Removing the Cardboard Box 7 Remove the accessory kits from the rear compartment of the crate 8 Check the packing list and verify that all accessories have been received 9 Lift the foam cap u...

Page 11: ...On the right side of the library lift the wooden bar out of its brackets on the pallet see figure 10 Figure 10 Removing the Wooden Bar 11 On the right side of the library unscrew the bolts that secur...

Page 12: ...e wooden bar in its brackets on the pallet to hold the library in place 14 Repeat steps 10 11 and 12 for the left side of the library 15 Slide out the two ramp extensions and the foam block all locate...

Page 13: ...to the installation site 2 Carefully lift the shipping bag off of the library see figure 13 Figure 13 Removing the Shipping Bag 3 Inspect the library for any damage that may have occurred during ship...

Page 14: ...gust 2002 14 Unpacking the Library Figure 14 Preparing the Ramp 5 Verify that the library s four leveling feet are raised If not raise each foot as needed as by turning the leveling foot until it is 1...

Page 15: ...6 a Remove the wooden bar from the ramp side of the pallet b Place the wooden bar under the ramp extensions for support Figure 16 Moving the Wooden Bar 7 With the help of one or more people carefully...

Page 16: ...rary to a grounded power source 2 Unlock and open the library doors a Using the key from the accessories kit unlock each door b Lift each door handle straight up and then turn the handle to unlatch ea...

Page 17: ...he load port Figure 18 Removing the Shipping Plate 5 Locate the vertical carriage assembly see Figure 19 Figure 19 Locating the Vertical Carriage Assembly 6 Remove the horizontal carriage restraint se...

Page 18: ...al axis toward the middle of the library 8 Remove the gripper restraint a Remove the screw that secures the gripper restraint to the belt clamp see figure 21 Figure 21 Removing the Gripper Restraint S...

Page 19: ...back toward the vertical axis e Slide the gripper assembly toward the vertical axis 9 Remove the vertical carriage restraint see figure 24 a Rotate the extension axis assembly 90 degrees b Remove the...

Page 20: ...iage restraint h Remove the tie wrap installed in step e i Gently lower the vertical carriage Figure 24 Removing the Vertical Carriage Restraint Storing the Shipping Materials 0 To store the shipping...

Page 21: ...load port shipping plate stop blocks foam cap screws and other packaging materials on the pallet 7 Collapse the cardboard box 8 Place the cardboard box on top of the packaging materials on the pallet...

Page 22: ...level a Determine which side of the library is low b Adjust the leveling foot on the low side of the library by rotating the leveling foot with the open end wrench 5 Repeat step 4 until the front is l...

Reviews: