Appendix B Relocating the Library
Preparing the Library for Operation
98
Quantum|ATL P3000 Series User’s Guide
Preparing the Library for Operation
2
After shipping or moving the library, refer to the
ATL P2000/
P3000/P6000 Pre-Installation Site Survey Instructions
and the
ATL
P3000 Series Unpacking Instructions
to:
• Prepare the new installation site
• Receive the library
• Uncrate the library (required in shipping the library)
• Position the library
• Prepare the library for operation
Summary of Contents for P3000 Series
Page 1: ...Quantum ATL P3000 Series Automated Tape Library User s Guide 6311601 05 Ver 5 Rel 0...
Page 8: ...Contents viii Quantum ATL P3000 Series User s Guide...
Page 12: ...Figures xii Quantum ATL P3000 Series User s Guide...
Page 20: ...xx Quantum ATL P3000 Series User s Guide...
Page 34: ...Chapter 1 Library Description Library Components 14 Quantum ATL P3000 Series User s Guide...