Model Q4P09
Installation, Operation and Maintenance
8
Rev 8/18/09
Q4P09-IOM-Q.doc
A
NCHORING
(O
PTIONAL
)
NOTE: Lift must be anchored in place if slope
is grater then 1/8” per 1 foot.
23) The anchor bolts must be installed at least 8”
from any crack, edge, or expansion joint.
24) Use a concrete hammer drill with a 3/4 inch
carbide bit. Tip diameter should conform to
ANSI Standard B94.12-1977 (.775 to .787).
Do not use excessively worn bits or bits
which have been incorrectly sharpened. A
core bit may be necessary if an obstruction is
encountered.
Never substitute with shorter
anchor.
25) Drill the anchor holes using the base plate as
a template. Drill through the floor if possible
or to a depth of 5 inches minimum.
26) Vacuum dust from the hole for proper holding
power.
27) Shim columns to plumb using the shims
provided or steel washers. DO NOT shim
more than 1/2" at any given point. Use a level
no less than 24” in length to plumb columns.
28) Assemble washer and nut to anchor with nut
just below impact section of bolt. Drive
anchor into hole until nut and washer contact
base. Tighten anchor bolts and recheck
column for plumb. Re-shim as required.
NOTE: Level bubble should not only be
between the lines, the bubble should be
centered between the lines. If shims do not
allow sufficient centering of the bubble, it is
best to lean the rear columns in the direction
toward each other and the front columns in
the direction toward each other.
29) Install the four cable ends with one load
nylon lock nut, and one jam nut.
Power Unit
30) Install the Power Unit to the column using the
supplied M8x20mm bolts and M8 nuts. The
power unit can be installed on either the front
or side of the power column to suit install
location, shown in
Fig 12
.
Fig 12 – Power Unit
31) For installs on the front of the column
(Fig
13)
, rout the power unit supply line to the
bulkhead shown below. Attach the 90
degree fitting at a slight angle downward and
secure the hose to the fitting.
Fig 13 – Supply Line, Front
32) Remove the 3/8-18 NPT plug on the side of
the power unit and a replace with the 3/8-18
NPT x 9/16-18 adapter and then attach the
90 degree elbow at a slightly downward
angle. Secure the hose to the bulkhead
shown in
Fig 14
.
Fig 14 – Return Line, Front
33) For installs with the power unit on the side of
the column rout the supply line to the
bulkhead shown in
Fig 15
.