Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15
51
D. Install the Refractory
1. Place the back refractory between the rear log support
bracket and the back of the firebox. Center the refractory
on the back of the firebox for best alignment with side
panels. See Figure 10.4.
Figure 10.3 Refractory Components
Figure 10.5 Place Right Side Refractory
TOP
REFRACTORY
LEFT SIDE
REFRACTORY
RIGHT SIDE
REFRACTORY
BACK
REFRACTORY
REAR LOG
SUPPORT
BRACKET
Figure 10.7 Place Top Refractory
REFRACTORY TAB
3. Repeat the same process for the left side panel. When
side refractory pieces are installed properly, the gap
between the refractory and the burner should be parallel.
See Figure 10.6.
Figure 10.6 Place Left Side Refractory
4. Place the top refractory into the notched area at the top
of the side refractories with the wide side toward the front
of the appliance. Center the refractory from side to side.
Figure 10.4 Install Rear Refractory
2. Place right side panel by inserting the front (tall edge) into
the front firebox corner and then press the narrow end up
to the refractory tab. See Figure 10.5.
Note:
Side brick panels will fit only if installed at an angle.
Do not attempt to push the brick flat against the outer wall of
the firebox. Panels should rest against the refractory tabs.
NOTCHED AREA
Figure 10.8 Refractory Installed
(NARROW SIDE)
(WIDE SIDE)
PARALLEL GAP
(LEFT & RIGHT SIDES)