Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15
17
Note
: As vertical pipe increases, a flue restrictor may be
required.
Top Vent - Vertical Termination
No Elbow
Figure 4.11
V
1
V
1
= 40 ft. Max. (12.2 m)
V
1
= 6 ft. Min. (1.8 m)