Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15
16
Note
: As vertical pipe increases, a flue restrictor may be
required.
H
2
H
1
V
2
V
1
INSTALLED VERTICALLY
OR HORIZONTALLY
Figure 4.10
Top Vent - Horizontal Termination - (continued)
Three Elbows
3 Elbows to Max. Horizontal
V
1
Minimum
H
TOTAL
Maximum
3 ft.
914 mm
2 ft.
610 mm
4 ft.
1.2 m
6 ft.
1.8 m
6 ft.
1.8 m
8 ft., 8 in.
2.6
8 ft.
2.4 m
11 ft., 4 in.
3.5
10 ft.
3.1 m
14 ft.
4.3
12 ft.
3.7 m
12 ft., 10 in.
3.9
16 ft.
4.9 m
10 ft., 4 in.
3.1
20 ft.
6.1 m
7 ft., 10 in.
2.4
24 ft.
7.3 m
5 ft., 4 in.
1.6
28 ft.
8.5 m
2 ft., 10 in.
864 mm