Quadra-Fire 41I-ACC User Manual Download Page 22

 22 

 

 

 

 

                        7045-910 

 

 

 

           October 14, 2013

41I-ACC

Figure 22.1 

 

Spark Arestor Cap 

Roof Flashing 

Storm Colla

Joist Shield/Firestop 

Double Wall 

Connector Pipe  

8.  Burn wood only.  Other types of fuels may generate 

poisonous gases (e.g., carbon monoxide).

9.  If unit burns poorly while an exhaust blower is on in home, 

(i.e., range hood), increase combustion air.

10.  Installation shall be in accordance with the Manufacturers 

Home & Safety Standard (HUD) CFR 3280, Part 24.

NOTICE: 
•   

Offsets from the vertical, not exceeding 45°, are allowed 

per Section 905(a) of the Uniform Mechanical Code (UMC). 

•   

Offsets greater than 45° are considered horizontal and are 

also allowed, providing the horizontal run does not exceed 

75% of the vertical height of the vent. 

•   

Construction, clearance and termination must be in com-

pliance with the UMC Table 9C. This installation must also 

comply with NFPA 211.

NOTICE:

 Top sections of chimney must be removable to allow 

maximum clearance of 13.5 feet (411cm) from ground level 

for transportation purposes.

1.  An outside air inlet must be provided for combustion and 

must remain clear of leaves, debris, ice and/or snow.  It 

must be unrestricted while unit is in use to prevent room 

air starvation which can cause smoke spillage and an 

inability to maintain a fire.  Smoke spillage can also set 

off smoke alarms.

2.  Unit must be secured to the mobile home structure at 

two attachment points.   Remove bolts from each side 

of insert and use plumbers tape to secure to structure 

(a washer may be required). Re-install bolts.  

3.  Unit must be grounded with #8 solid copper grounding 

wire or equivalent and terminated at each end with N.E.C. 

approved grounding device.

4.  The  factory-built  fireplace  must  meet  (UM)84-HUD 

requirements for outside combustion air supply to 

the  fireplace  fire  chamber  and  the  chimney  must  be 

listed to UL103 HT or a listed UL-1777 full length six 

inch (152mm) diameter liner must be used. It must be 

equipped with a spark arrestor cap and the outside air 

must be installed on the insert. 

5.  Refer to 

pages 7-8

 of this manual for clearance to 

combustibles  and  floor  protections  requirements.

 

 All 

clearances must be followed precisely.

6.  Use silicone to create an effective vapor barrier at 

the location were the chimney or other component 

penetrates to the exterior of the structure.

7.  Follow the chimney and chimney connector manufacturer’s 

instructions when installing the flue system for use in a 

mobile home.

CAUTION

THE STRUCTURAL INTEGRITY OF THE MOBILE HOME 

FLOOR, WALL AND CEILING/ROOF MUST BE MAINTAINED

Do NOT cut through:

•  Floor joist, wall, studs or ceiling trusses.

• 

Any supporting material that would affect the structural 

     integrity.

•  NEVER INSTALL IN A SLEEPING ROOM.

Consumes oxygen in the room.

WARNING

Asphyxiation Risk.

WARNING

Do not draw outside combustion air from:

•  Wall, floor or ceiling cavity

•  Enclosed space such as an attic or garage
•  Close proximity to exhaust vents or chimneys.

Fumes or odor may result

Fire Risk.
Asphyxiation Risk.

Mobile Home Installation

Summary of Contents for 41I-ACC

Page 1: ...liance Do not overfire If heater or chimney con nector glows you are overfiring Overfiring will void your warranty Comply with all minimum clearances to combustibles as specified Failure to comply may...

Page 2: ...es Needed 5 E Inspect Appliance and Components 5 F Install Checklist 6 3 Dimensions and Clearances A Appliance Dimensions 7 B Clearances to Combustibles 8 C Alternate Floor Protection Calculation 9 D...

Page 3: ...ed trademark of Hearth Home Technologies Installation and use of any damaged appliance Modification of the appliance Installation other than as instructed by Hearth Home Technologies Installation and...

Page 4: ...national codes and regulations Consult insurance carrier local building fire officials or authorities having jurisdiction about restrictions installation inspection and permits CAUTION WARNING DO NOT...

Page 5: ...ir handler joints and seams taped or sealed Basement installations should be avoided D Tools And Supplies Needed Before beginning the installation be sure the following tools and building supplies are...

Page 6: ...ght requirements Roof flashing installed and sealed Terminations installed and sealed Clearances Section 3 Pg 8 Combustible materials not installed in non combustible areas Verified all clearances mee...

Page 7: ...ound w Cast STD 45 in 1143mm 31 in 787mm Metal Surround w Cast Trim REG 48 in 1219mm 34 in 864mm Metal Surround w Standard Trim STD 43 in 1092mm 31 in 787mm Metal Surround w Standard Trim LRG 51 in 12...

Page 8: ...6 inch 152mm S635 flue liner required as per ULC S628 In USA a minimum 5 ft length 1 82m 6 inch 152mm diameter flue liner is required as per UL 1482 SIDE TRIM SIDE WALL TOP TRIM 22 5 8 575mm 32 1 8 81...

Page 9: ...r k value The HIGHER the R factor means less heat is being conducted through the non combustible material to the combustible material beneath it The R value of a material must be equal or larger then...

Page 10: ...rough the warm space enclosed by the build ing envelope This helps to produce more draft espe cially during lighting and die down of the fire Penetrate the highest part of the roof This minimizes the...

Page 11: ...Minimum 3 ft 91cm Minimum Wall or Parapet Flat Roof F 2 10 3 Rule These are safety requirements and are not meant to assure proper flue draft This appliance is made with a 6 inch 152mm diameter chimne...

Page 12: ...cleaning and re installation When possible install an airtight clean out door to the rear of the smoke shelf A Venting Systems Chimney Connector It is also known as flue pipe or stove pipe It must be...

Page 13: ...ordance with Insert Listing Follow Manufacturer s Instructions for Maximum Liner Extension Above Chimney Maximum 30 Degrees Offset in Chimney Combustible Floor Masonry Chimney Cont d This insert confo...

Page 14: ...ue collar and the chimney top The air flow of the factory built zero clearance fireplace system must not be altered The flue liner top support attachment must not reduce the air flow for the existing...

Page 15: ...lace opening the portion of the insert extending onto the hearth must be supported Manufacturer designed adjustable support kit can be ordered from your dealer Final approval of this installation type...

Page 16: ...ly Chimney heights exceeding 25 feet 7 62m from base of appliance may create an over draft situation Overdraft condition may create over firing Over firing may ignite creosote and or damage appliance...

Page 17: ...tion WARNING Option One Installation Instructions The outside air cover comes packaged with the component pack It is necessary to remove the blower housing and block off the room air with the outside...

Page 18: ...gure 18 1 2 Attach gasket to bottom side of flue collar with a thin coat of silicone C Leveling Legs 1 Remove the 2 screws already installed on each leg 2 Move legs to the desired height 3 Re install...

Page 19: ...w driver attach the side sur rounds to the top surround using 2 8 sheet metal screws provided with the kit Figure 19 1 3 Lay the trim face down and place the corner brackets into position 4 Using a st...

Page 20: ...0 1 3 Using phillips head screw driver remove snap disc bracket and cord restraint bracket from right side Figure 20 2 4 Re install snap disc bracket and cord restraint bracket to left side of blower...

Page 21: ...eet metal shears cut trim along the marked edge The cut edge fits under lip of top trim so it allows for some variance in your straight edge 5 The double sided tape that holds front and side trims to...

Page 22: ...from each side of insert and use plumbers tape to secure to structure a washer may be required Re install bolts 3 Unit must be grounded with 8 solid copper grounding wire or equivalent and terminated...

Page 23: ...ludes Door Trim Spring Handle Hinge Pins And Logo Gold 41IDRTRIM GD Nickel 41IDRTRIM NL D T S C C A I 1 4 P S y l e t a r e p e S t i K m i r T r e d r O 1 3 X 3 4 d n u o r r u S Surround Trim Kit 43...

Page 24: ...mportant operating and maintenance instruc tions included Leave this manual with party responsible for use and operation Read understand and follow these instruc tions for safe installa tion and opera...

Reviews: