![Quadivator PB60 06 Assembly/Operators/Parts Manual Download Page 5](http://html.mh-extra.com/html/quadivator/pb60-06/pb60-06_assembly-operators-parts-manual_768789005.webp)
Quad Power Brush
Operators Manual – Version 06
iii
PRE- DELIVERY CHECKLIST
Check off all items as they are found satisfactory or after adjustments are made:
All safety shields and guards are securely in place!
All decals are in place and readable!
All fasteners are securely tight
Start the Quadivator Power Brush and allow it to run for 5 – 10 minutes, check for
excessive operation or unusual noise.
The Quadivator Power Brush has been tested and to the best of my knowledge, is ready to
be delivered to the customer!
Date Pre-delivered –
Signature –
To help prevent personal injury from
thrown objects, never walk or stand in
the front area of the brush during run-in
or operation!
CAUTION