5
Dual Pick-Point Deployment
For a dual pick-point deployment with two pick-points, two 16 mm (5/8 inches) shackles (not
included) can be attached to the
center
rail of the Array Frame at the CG point
s
for the desired
NOTE:
EASE Focus 3 can be utilized to locate the CG point and desired vertical angle for
specific deployments. (EASE Focus 3 is available for free download from
www.qsc.com
.)
Optional Eyebolt
When a downtilt outside of the CG of the Array Frame is needed, an
M10 Eyebolt can be used on the rear of the lowest loudspeaker of the
array to provide another pick-point for further support to angle the system.
(See — Figure 12 —)
WARNING!:
Do not exceed the Working Load Limits of the
M10 Pullback Point as stated in the table below.
Working Load Limits
Model
Individual
Component Weight
7:1 Safety Factor
10:1 Safety Factor
12:1 Safety Factor
LA108 M10 Pullback Point
Built into rear of product
92.1 kg / 203 lb
64.4 kg / 142 lb
53.5 kg / 118 lb
LA112 M10 Pullback Point
Built into rear of product
80.3 kg / 177 lb
56.2 kg / 124 lb
46.7 kg / 103 lb
— Figure 11 —