
Installa on Procedure
10
July 2013
Preparing the Key Solenoid Rail
In
this
chapter,
we
determine
the
throw
of
the
key
solenoid
plunger
in
rela on
to
the
piano
ac on’s
key
‐
tail
travel.
We
also
walk
through
the
process
of
key
solenoid
alignment
with
respect
to
the
piano
ac ons
keytails.
When
this
chapter’s
work
has
been
done,
the
solenoid
rail
will
have
the
proper
rail
height
and
plunger
throw.
The
moun ng
brackets
will
be
in
place
and
ready
for
moun ng
to
the
piano.
Tools
needed
include
the
2
op onal
rail
support
brackets
a
11/32"
nut
driver,
two
rail
bracket
moun ng
screws,
screwdriver,
hacksaw,
metal
fi
le,
ruler
and
a
pencil.
The
piano
ac on
is
on
your
workbench
and
the
keys
are
facing
away
from
you.
The
Pianoma on
Key
Solenoid
Rail
is
shipped
assembled.
Its
component
parts
are
as
follows:
Key Solenoid Plunger Throw...
Step 1
.
To
take
advantage
of
PNOma on's
best
reproducing
capabili es,
it
is
essen al
that
the
plung
‐
er
throw
is
slightly
greater
than
the
keytail
li .
Note
the
following
measurements:
B
.
Measure
the
bo om
of
the
keytail
to
the
keybed
at
the
KEYTAIL
UP
posi on.
A.
Measure
the
bo om
of
the
keytail
to
the
keybed
at
the
KEYTAIL
DOWN
posi on.
A
B
Keybed
Keyframe
Step 2.
Take
the
key
li
measurement
“C”
above
and
add
1/16"
to
compensate
for
the
felt
plung
‐
er
p.
This
is
the
measurement
used
to
fi
nd
the
rest
posi on
of
the
plunger.
B
=___________
A=___________
B
‐
A(C)=__________
Plunger Throw = C + 1/16” ______________
Summary of Contents for PMII
Page 26: ...Installa on Procedure 26 July 2013 Installing the Steinway Sostenuto Assembly Order 70897 ...
Page 50: ......
Page 51: ......
Page 52: ......