
B – Command Line Interface
Create Command
B-22
59096-02 C
S
The following is an example of the Create Support command and how to
download the support file to your workstation. When prompted to send the support
file to another machine, decline, then close the Telnet session. Open an FTP
session on the switch and log in with the account name
images
and password
images
. Transfer the dump_support.tgz file in binary mode with the Get
command.
SANbox (admin) #>
create support
Log Msg:[Creating the support file - this will take several seconds]
FTP the dump support file to another machine? (y/n):
n
SANbox (admin) #> quit
>ftp
switch_ip_address
user:
images
password:
images
ftp>
bin
ftp>
get dump_support.tgz
xxxxx bytes sent in xx secs.
ftp>
quit
The following is an example of the Create Certificate command:
SANbox (admin) #> create certificate
The current date and time is day mon date hh:mm:ss UTC yyyy.
This is the time used to stamp onto the certificate.
Is the date and time correct? (y/n): [n] y
Certificate generation successful.
Summary of Contents for SANbox 5600 Series
Page 10: ...Page x 59096 02 C SANbox 5600 Series Fibre Channel Switch Installation Guide S...
Page 28: ...1 Introduction Technical Support 1 18 59096 02 C S Notes...
Page 68: ...3 Planning Fabric Management 3 28 59096 02 C S Notes...
Page 112: ...5 Diagnostics Troubleshooting Recovering a Switch 5 16 59096 02 C S Notes...
Page 116: ...6 Removal Replacement Power Supply Removal and Replacement 6 4 59096 02 C S Notes...
Page 264: ...B Command Line Interface Zoning Command B 142 59096 02 C S Notes...
Page 270: ...SANbox 5600 Series Fibre Channel Switch Installation Guide Glossary 6 59096 02 C S Notes...
Page 280: ...SANbox 5600 Series Fibre Channel Switch Installation Guide Index 10 59096 02 C S Notes...