INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11S.X / BFG
10
Mounting options with bolts
The illustrated installation options apply for both horizontal and vertical module orientation.
Module
Bolt
Mounting rail
4 BOLTS/SCREWS ON LONG SIDE &
2 CONTINUOUS RAILS PARALLEL TO SHORT SIDE
4 BOLTS / SCREWS ON LONG SIDE &
2 CONTINUOUS RAILS UNDERNEATH LONG FRAME PARTS
FB1
L
FB2
L
POSITION OF
BOLTS* [in]
TEST LOAD
PUSH / PULL [Pa]
DESIGN LOAD
PUSH / PULL [Pa]
POSITION OF
BOLTS* [in]
TEST LOAD
PUSH / PULL [Pa]
DESIGN LOAD
PUSH / PULL [Pa]
L
20.9 (531 mm)
5400 / 2400
3600 / 1600
L
20.9 (531 mm)
3600 / 2400
2400 / 1600
FB1
This mounting option is not recommended as mounting rails will cast shade on the module rear side.
FB1, FB2
Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the
module and substructure).
Use M8 corrosion-proof screws and washers (diameter ≥ 0.62 in (15.8 mm)) for mounting slots (Detail A, Fig.1)
and M6 corrosion-proof screws and washers or bobtails for tracker slots (diameter ≥ 0.51 in (13 mm); Detail B,
Fig. 1). Mounting screws and washers should have the same material properties.
4 BOLTS/SCREWS ON LONG SIDE &
2 CONTINUOUS RAILS UNDERNEATH LONG FRAME PARTS
mFB2
L
POSITION OF
BOLTS* [in]
TEST LOAD
PUSH / PULL [Pa]
DESIGN LOAD
PUSH / PULL [Pa]
L
20.9 (531 mm)
2700 / 2400
1800 / 1600
mFB2
Mounting rails need to extend beyond the middle of mounting holes by at least 0.79 in (20 mm). Clamps
must not extend beyond the mounting rails.
Use M8 corrosion-proof screws and washers (diameter ≥ 0.62 in (15.8 mm)) for mounting slots (Detail A, Fig.1)
and M6 corrosion-proof screws and washers or bobtails for tracker slots (diameter ≥ 0.51 in (13 mm); Detail B,
Fig. 1). Mounting screws and washers should have the same material properties.
*
Distance between outer edge of module and middle of the clamp.
2 Planning
2.3 Mounting options