INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11S.X / BFG
12
Module
Clamp
Mounting rail
TRACKER INSTALLATION USING CLAMPS
TC1
L
POSITION OF
BOLTS* [in]
TEST LOAD
PUSH / PULL [Pa]
DESIGN LOAD
PUSH / PULL [Pa]
L
40.6 - 42.6
(1031 - 1081 mm)
1800 / 1800
1200 / 1200
TC1
Ensure minimum support depth of 0.47 in (12 mm) on the backside and 0.39 in (10 mm) on the front side of
the module.
*
Distance between outer edge of module and middle of the clamp.
2 Planning
2.3 Mounting options