![Q3 ENERGIE QFire Installation And Operation Manual Download Page 8](http://html1.mh-extra.com/html/q3-energie/qfire/qfire_installation-and-operation-manual_4364745008.webp)
Installation and Operation Manual
Q
F
ire – Fire Brigade Switch
Figure 3: Overview interconnection and control lines
Delivery content according to figure 3:
•
Shown connection plugs are included.
•
All cables have to be provided on-site.
•
Emergency stop and status display (potential-free switch) are
optionally
available from Q3 Ener-
gie GmbH & Co KG.
Delivery content overview, see chapter 3 DELIVERY CONTENT, page 16.
Q3 Energie GmbH & Co. KG
Phone
+49 (0)8341/9080 334
IA-BA_QFire _E_AS002_V1.0
Moosmangstr. 8
Status
March 15, 2024
Page
8 | 28
87600 Kaufbeuren
Our general terms of business are to be applied.
Germany
Web
www.q3-energie.de
Errors and changes reserved.
eh
alten.
control line
on-site
cable 5-wire 5x2.5 mm²
online
emergency
stop
status
control box