Installation and Operation Manual
Q
F
ire – Fire Brigade Switch
4
INSTALLATION
In the event of improper or non-professional installation, there is a risk of electric shock,
of a fire as well as damage to the product and the connected components!
Observe the safety regulations according to chapter 1 SAFETY INSTRUCTIONS, page 3.
4.1
INSTALLATION POINT
Install the switch box(es) and control box in a load-bearing location (rack/wall). The installation location
should be chosen in such a way that the boxes are not directly exposed to the weather and are shaded as
much as possible.
Operating temperature range of -15°C to +60°C must be maintained.
Direct sunlight, as well as additional heating by e.g. machines, should be avoided.
The switch boxes can be attached to the substructure/frame under the PV modules, for example.
4.2
ATTACHING
The control box/switch box(es) are attached with the appropriate mounting ears (included).
When tightening the screws, keep in mind, that the housing (standard version) is made of plastic ma-
terial – polycarbonate. Only use suitable tools.
B
efore start-up, check the complete system for hazards!
Q3 Energie GmbH & Co. KG
Phone
+49 (0)8341/9080 334
IA-BA_QFire _E_AS002_V1.0
Moosmangstr. 8
Status
March 15, 2024
Page
18 | 28
87600 Kaufbeuren
Our general terms of business are to be applied.
Germany
Web
www.q3-energie.de
Errors and changes reserved.
eh
alten.