background image

Installation and Operation Manual

 

         

 

           

 

           

 

        

 

 

Q

   

F

  ire – Fire Brigade Switch

 

 

8.2 CERTIFICATE OF COMPLIANCE

Q3 Energie GmbH & Co. KG 

Phone

+49 (0)8341/9080 334

IA-BA_QFire _E_AS002_V1.0

Moosmangstr. 8

Status 

March 15, 2024

Page

26 | 28

87600 Kaufbeuren

Email

[email protected]

Our general terms of business are to be applied.

Germany

Web

www.q3-energie.de

Errors and changes reserved.

eh

alten.

Summary of Contents for QFire

Page 1: ...according to IEC60947 3 Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status March 15 2024 Page 1 28 87600 Kaufbeuren Email info q3 energie de Our general term...

Page 2: ...rgie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status March 15 2024 Page 2 28 87600 Kaufbeuren Email info q3 energie de Our general terms of business are to be applie...

Page 3: ...oing ba sis As a result the illustrations dimensions technical data and general content listed below may change as a result of adaptation to new knowledge This manual is intended to help you to optima...

Page 4: ...cor dance with the instructions described in this manual 3 if the device is operated outside of its intended use see chapter 1 5 INTENDED USE page 5 and chapter 1 6 NON INTENDED USE page 5 4 if the de...

Page 5: ...n this document Usage installation of parts and accessories others than the manufacturer s original s Usage of the printer in non compliance to this manual Changes modifications not approved by Q3 Ene...

Page 6: ...tion cable breakage of the control line PV system switched off fending off dangers from people animals buildings and objects When used as intended and installed properly and professionally the QFire s...

Page 7: ...the control box LED SPD see chapter 2 3 1 LED STATUS INDICATION Figure 2 Overview function schematics Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status Marc...

Page 8: ...ch are optionally available from Q3 Ener gie GmbH Co KG Delivery content overview see chapter 3 DELIVERY CONTENT page 16 Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosma...

Page 9: ...ion about QFire Cluster can be downloaded from our website www q3 energie de Figure 4 Overview interconnection of cluster control boxes 2 1 1 2 QFire LIVE The QFire system status can also be called up...

Page 10: ...ndicator 10 or an emergency stop remote OFF 8 can be connected Figure 6 Control box No Description 1 LED Error red 2 LED SPD surge protective device red green 3 LED Power green 4 Main switch S1 positi...

Page 11: ...ntrol box or preceding switch box es 6 Connector for control lines to further switch box es or for termination dongle 7 Insert for PE 8 LED Error red 9 LED SPD surge protective device red green 10 LED...

Page 12: ...x Figure 12 Type plate switch box Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status March 15 2024 Page 12 28 87600 Kaufbeuren Email info q3 energie de Our g...

Page 13: ...operation red red off Control lines interrupted or under voltage at the control lines QFire system partly not operating off off off QFire system OFF not operating Q3 Energie GmbH Co KG Phone 49 0 834...

Page 14: ...2 1 OPTIONAL MONITORING OF OVERVOLTAGE SPD A surge protection device 3 Fig 8 page 11 is installed in each MPP tracker in the switch box These can optionally be monitored If none of the SPD modules has...

Page 15: ...ly a status indicator potential free contact 10 Fig 6 or an emergency stop remote OFF 8 Fig 6 can be connected ex ternally In this way the switch off process can also be triggered exter nally for all...

Page 16: ...complete and undamaged Be sure to remove all parts from the packaging Claims for damages caused during transport can only be asserted if the delivery service is notified immediately Please prepare a...

Page 17: ...x Maximum string voltage 1500VDC at max 11 A or 1200 VDC at up to 15A per string 6 pieces of mounting ears pre assembled Connection of the 4 pin control cable on site via spring loa ded terminals cabl...

Page 18: ...ure range of 15 C to 60 C must be maintained Direct sunlight as well as additional heating by e g machines should be avoided The switch boxes can be attached to the substructure frame under the PV mod...

Page 19: ...h control box as well as switch box slaves with power supply must be connected to 230V AC With option surge protection device an appopriate grounding has to be installed 3 Check the system function as...

Page 20: ...ector Within the delivery content 1 each Wieland plug RST08 incl allen key for lockable plug INFO A mounting instruction of the Wieland plugs can be downloaded from our website QFire PV Feuerwehrschal...

Page 21: ...T REVERSE POLARITY String lines must maintain their assignment input to output Figure 15 Connections switch box Figure 16 Interconnection PV strings and surge protection device SPD Q3 Energie GmbH Co...

Page 22: ...ng off at the same time Time shifted shutdown with de lay switching option 7 Now check the voltage on the inverters All strings up from the switch box right side see figure 16 page must be voltage fre...

Page 23: ...mplete functional test must be carried out and documented annually At this the QFire system is switched off and all strings from the distance bet ween the QFire switch box es and inverter s must be vo...

Page 24: ...es of right length and diameter QFire system can not be turned off with the control box main switch off 0 LED Power green QFire control box defective Deinstall control box Bridge the PV strings for co...

Page 25: ...NFORMITY Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status March 15 2024 Page 25 28 87600 Kaufbeuren Email info q3 energie de Our general terms of business...

Page 26: ...PLIANCE Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status March 15 2024 Page 26 28 87600 Kaufbeuren Email info q3 energie de Our general terms of business a...

Page 27: ...rotection Power consumption approx 40 mA at 230 VAC 3 W string connected Rated voltage isolation 1 500 VDC System voltage max 1 500 VDC Switch voltage max at 15 A 1 200 VDC Control voltage 12 VDC 12 V...

Page 28: ...ts of the public waste management authorities or at the take back points set up by manufacturers or distribu tors within the meaning of the Electrical and Electronic Equipment Act On the website of th...

Reviews: