English
9
FIG52
FIG53
FIG54
FIG55
4
、
Set SW3 buton on the connection board of rotation box
an appropriate protocol and baud rate. (As to the
specificmethod,,please refer to the appendis’s
SW3code setting in the end of the manual)
,
And then
loosen the screw , lock the rotation box tightly (as
shown on FIG 51)
Third : Install the integreated chip
1
、
Be sure the red card and the green card of the chip are
corresponding with the red lable and the green lable
and then push upward. Insert the green card first and
then the red one. You can be sure that it’s been
installed already when you hear two meticulous sound.
For the sake of safty, swing the chip from one side to
another to ensure a steady installation (as shown FIG
52)
2
.
、
Normally, the red indicator is on when the power is
supplied.
Fouth: Installation of the down-cover
1
、
Paint the lubrication on the circle of “O” shape and
fix it on the circle groove in the down-cover.
Connect the end of safty rope in the down-cover to
the fixed hole on the embeded up-cover.(as shown
on FIG 53)
2
、
Make the screw’s fixed hole on the down-cover
match the button seat on the edge of the up-cover.
Press the down-cover tightly and tighten up the screw
and lock the down-cover.(as shown on FIG 54.
、
55)