background image

2

3

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.POWER-G5 / L-G5 • Q.PRIME-G5 / L-G5 – EN

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.POWER-G5 / L-G5 • Q.PRIME-G5 / L-G5 – EN

2

3

DOCUMENT REVISION 01
This Manual is valid for Africa, Asia, Europe, Latin America, and South America as of July 1st 2017 for Q.POWER-G5, Q.PRIME-G5, Q.PEAK-G5, 
Q.POWER L-G5, Q.PRIME L-G5, Q.PEAK L-G5 solar modules, and replaces all earlier versions. 

DISCLAIMER

Technical parameters and the design are subject to change. The data sheets and customer information valid at the point in time when the relevant 
module was manufactured apply to the installation, mounting, and maintenance procedures for the respective solar modules. The installation tech-
niques, handling and use of the product are beyond company control. Therefore, Hanwha Q CELLS assumes no responsibility for loss, damage or 
expense resulting from improper installation, handling or misuse. Hanwha Q CELLS module can be installed by many kinds of methods including, 
but are not limit to bolting, clamping and inserting as follow, but if you want to use an installation method which is not covered in this manual, 
please inform us before you install to make sure if our warranty will be covered or not. 

With solar modules from Hanwha Q CELLS GmbH (hereafter 
referred to as "Q CELLS") you can directly transform the 
sun’s limitless energy into environmentally-friendly solar 
electricity.
In order to ensure the maximum performance of your Q CELLS 
solar modules, please read the following instructions care-
fully and observe all guidelines. Non-compliance may result 
in damage and/or physical injury.

This installation and operation manual (hereafter also 
referred to as the “Manual”) provides instructions for 
the safe installation and operation of crystalline solar 
modules.

 

Ä

Please read these instructions carefully before proceeding 
with your installation.

 

Ä

Please retain these instructions for the life of the solar 
modules.

 

Ä

Please ensure that this Manual is available to the operator 
at all times.

 

Ä

This Manual should be given to all subsequent owners 
or users of the solar modules.

 

Ä

All supplements received from the manufacturer should 
be included.

 

Ä

Please observe all other applicable documents.

 

Ä

If your questions are not satisfactorily answered 

 

in the manual, please contact your system supplier. 

Additional information can be found on our website at 
www.q-cells.com. 

Intended Use

This manual is valid for Africa, Asia, Europe, Latin 
America, and South America. These instructions contain 
information regarding the safe handling and use of quality 
crystalline solar modules from Q CELLS and for their 
installation, mounting, wiring, maintenance and disposal. 

Symbols and Labels

The following symbols and labels are used throughout the 
Manual for ease of use. 

SYMBOL

DESCRIPTION

 

Ä

 

Procedure with one or more steps. 

• 

 

Lists of items.

Ensure that when carrying out a pro-
cedure, you check the results of said 
procedure.
  

Prohibited.
 

Beware of possible danger or damage. 
Categories:

• 

Danger: Risk of fatal injury

• 

Attention: Risk of serious injury 
or damage to property

• 

Note: Risk of damage to product

Safety Regulations

In particular the installer as well as the operator of a 
module is responsible for compliance with all applicable 
statutory requirements and regulations. 

 

Ä

Unless otherwise specified by any laws or regulations, 

the following stipulations must be upheld at all times 
during the installation, operation, and maintenance of 
the solar modules: 

• 

This manual.

• 

Other applicable stipulations (such as country-specific 

regulations for pressure equipment, operational safety, 
hazardous goods, and environmental protection).

• 

Regulations and requirements specific to the system.

• 

Any applicable laws and requirements, in particular 

international,  country  specific,  regional  laws  and 

stipulations governing the planning, installation, and 
operation of solar power systems and work on roofs.

• 

Any valid international, national and regional regulations 
governing work with direct current, especially those 
applicable to the installation of electrical devices and 
systems, and regulations issued by the respective 
energy provider governing the parallel operation of 
solar power systems.

• 

Any  international,  country  specific  and  regional 

accident-prevention regulations.

• 

Other applicable stipulations provided by the relevant 
national institutions regarding safety in the installation 
and operation of electrical items. 

Qualified & Skilled Personnel

Both, the installer and operator are responsible for 
ensuring that installation (including connection to the 
grid), maintenance and dismantling are carried out by 

trained  and  qualified  specialists  with  approved  training 
certificates (issued by a state or federal organization) for 

the respective specialist trade.

Electrical  work  may  only  be  performed  by  an  officially 
certified tradesperson in accordance with the stipulations 

applicable in the relevant country with regard to norm and 
regulations (in Germany e.g. DIN norms, VDE regulations) 
and the stipulations of the local grid operator and/or 
energy provider.  

TABLE OF CONTENTS

1  INTRODUCTION  

3

2 PLANNING  

5

2.1  Technical specifications 

 

5

2.2 Requirements 

 

6

2.3  Mounting options  

7

2.4  Electrical layout  

9

3 INSTALLATION 

 

10

3.1  Safety and transport  

10

3.2  Preparation of installation  

12

3.3  Module installation  

13

4  ELECTRICAL CONNECTION  

14

4.1 Safety 

 

14

4.2  Electrical installation safety  

15

4.3  Connection of modules  

16

4.4  After installation  

17

5 GROUNDING 

 

18

6  FAULTS AND DEFECTS  

18

7 DISPOSAL 

 

18 

8 MAINTENANCE 

 

18

1 INTRODUCTION

Summary of Contents for Q.POWER L-G5.1

Page 1: ...Valid for Africa Asia Europe Latin America South America Q POWER G5 1 L G5 1 Q PRIME G5 1 L G5 1 SOLAR MODULES INSTALLATION AND OPERATION MANUAL ...

Page 2: ...maintenance and disposal Symbols and Labels The following symbols and labels are used throughout the Manual for ease of use SYMBOL DESCRIPTION Ä Ä Procedure with one or more steps Lists of items Ensure that when carrying out a pro cedure you check the results of said procedure Prohibited Beware of possible danger or damage Categories Danger Risk of fatal injury Attention Risk of serious injury or ...

Page 3: ...it requirements prior to installation of the solar power system Your financial success depends on the fulfillment of these requirements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Cleaning manual 1 INTRODUCTION 2 1 Technical specifications 2 PLANNING Fig 1 External dimensions...

Page 4: ...çade Forces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Guarantees long term stability Avoid the usage of different metals to prevent contact corrosions Allows for stress free expansion and contraction due to temperature fluctuations Ä Ä Ensure that no mechanical stresses e g caused by vibrations twisting or expansion are generate...

Page 5: ...amp Subconstruction Mounting profile TYPE OF INSTALLATION MODULE TYPE LONG SIDE SHORT SIDE INSTALLATION WITH CLAMPS Q PRIME L G5 1 Q POWER L G5 1 INSTALLATION ON MOUNTING POINTS Q PRIME L G5 1 Q POWER L G5 1 INSTALLATION WITH INSERTION PROFILES Q PRIME L G5 1 Q POWER L G5 1 CL1 246 493 FB1 4 mounting slots 332 EN IP1 IP2 CL3 0 248 EU IP1 IP2 2 3 Mounting options 2 PLANNING TYPE OF INSTALLATION MOD...

Page 6: ...ower class Safety Factor During normal operation a module may generate a greater current and or higher voltage than that determined under standardized test conditions Please use a safety factor of 1 25 for the following Calculating the voltage measurement values Voc of components Calculating the current measurement values ISC of conductors Sizing of control systems connected to the outlets of the ...

Page 7: ...ol and dry rooms The packaging is not weatherproof DANGER Risk of fatal injury due to electric shock Ä Ä Do not install damaged modules Ä Ä Inform your distributor of any damages immediately 3 1 Safety and transport 3 INSTALLATION NOTE Module damage may occur Ä Ä Never lift or move the module with the connection cables or junction box Ä Ä Carry modules upright and horizontally as shown NOTE Module...

Page 8: ... shock Ä Ä Only use dry insulated tools Ä Ä Do not carry out the installation alone Only install undamaged modules and components Ä Ä Do not modify the module e g do not drill any additional holes 3 2 Preparation of installation 3 INSTALLATION Ä Ä Maintain an interval of at least 10 mm between two modules along the short side and 5 mm along the long side 10 mm 5 m m EU Option 2 Ä Ä Install the mod...

Page 9: ...verter prior to separation Ä Ä Be sure to observe the specified time intervals after switching off the inverter High voltage components need time to discharge DANGER Risk of fatal injury due to electric shock Ä Ä Never open the junction box Ä Ä Change of bypass diodes is only allowed by qualified and trained personnel in disconnected and covered state DANGER Risk of fatal injury due to electric sh...

Page 10: ...atal injury due to electric shock Ä Ä Ensure that all electrical components are in a proper dry and safe condition 4 3 Connection of modules 4 ELECTRICAL CONNECTION The 60 cell modules with min 1 000mm and for the 72 cell modules with min 1 200mm long cable in portrait orientation can be wired as a 2nd next neighbor 2nd next neighbor Wiring without a return cable Standard wiring with a return cabl...

Page 11: ...modules by yourself Ä Ä Please contact an installer or Q CELLS Technical Customer Service Department Ä Ä Dispose of modules in accordance with the local disposal regulations Ä Ä The symbols on the products packaging and or accompanying documents mean that end of life photovoltaic modules should not be mixed with general household waste For proper treatment recovery and recycling of end of life pho...

Page 12: ...d Qidong City Jiangsu Province China TEL 86 0 5138360 6222 FAX 86 0 5138360 6376 EMAIL sales hanwha qcells com WEB www q cells com Subject to change without notice Hanwha Q CELLS Installation_Manual_Q POWER_Q PRIME_G5 1_L G5 1_module_series_2017 12_Rev02_EN ...

Reviews: