INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.POWER-G5 / L-G5 • Q.PRIME-G5 / L-G5 – EN

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.POWER-G5 / L-G5 • Q.PRIME-G5 / L-G5 – EN

Protective Grounding

 

Ä

The modules must be grounded in accordance with the 
local statutory regulations.

Functional grounding

• 

When using an installation tilt of < 5° a functional 
grounding at the negative generator conncetion must 
be implemented.

 

Ä

Ensure that the difference of potential between the 
negative generator connection and the PE(N) of every 
MPP tracker of the respective inverters is 0 V.

 

Ä

Follow the directions of the inverter manufacturer.

 

Ä

Only use inverters which include lincensed grounding 
kits.

 

Ä

For an adequate ground, the grounding hardware should 
penetrate the anodized layer.

If a PV system will be installed in warm and humid 
climates or close to a source of continual moisture 
(waterfall, reservoir, etc.), these situations may cause PID 
reducing the performance of the PV system. To reduce 
the risk of PID, we strongly recommend installers to have 
such protections:

• 

PV module grounding of negative pole 

• 

Using Isolated Transformer inverter

• 

Using an off-set box or relevant technology units

5       GROUNDING

7 DISPOSAL

 

Ä

Do not disconnect modules by yourself.

 

Ä

Please contact an installer or Q CELLS Technical Customer 
Service Department.

 

Ä

Dispose of modules in accordance with the local disposal 
regulations.

 

Ä

The symbols on the products, packaging, 
and /or accompanying documents mean 
that end of life photovoltaic modules 
should not be mixed with general 
household waste. For proper treatment, 
recovery and recycling of end of life 
photovoltaic modules, please take them to 
applicable collection points in accordance 
with your national legislation. If you wish 
to discard end of life photovoltaic modules, 
please contact your local authorities or 
dealer and ask for the correct method of 
disposal.

Q CELLS solar modules are known for a long operating 
life and minimal maintenance effort and expense. Dirt 
and grime are usually washed away by rain. If the module 
is fully or partially shaded by dirt or debris (e.g., plants, 
bird droppings), it needs to be cleaned to prevent a loss 
of performance.

Maintenance

 

Ä

The system should be inspected by an installer annually 
to check the following:

• 

all system components sit securely and are corrosion 
free.

• 

the connection is secure and all electrical components 
are clean and undamaged.

FAULTS AND DEFECTS

DANGER!  
Risk of fatal injury due to electric shock!

 

Ä

Do not attempt to fix any problems yourself (e.g., 

glass cracks, damaged cables).

 

Ä

Please contact an installer or Q CELLS Technical 
Customer Service Department.

8 MAINTENANCE

Summary of Contents for Q.POWER L-G5.1

Page 1: ...Valid for Africa Asia Europe Latin America South America Q POWER G5 1 L G5 1 Q PRIME G5 1 L G5 1 SOLAR MODULES INSTALLATION AND OPERATION MANUAL ...

Page 2: ...maintenance and disposal Symbols and Labels The following symbols and labels are used throughout the Manual for ease of use SYMBOL DESCRIPTION Ä Ä Procedure with one or more steps Lists of items Ensure that when carrying out a pro cedure you check the results of said procedure Prohibited Beware of possible danger or damage Categories Danger Risk of fatal injury Attention Risk of serious injury or ...

Page 3: ...it requirements prior to installation of the solar power system Your financial success depends on the fulfillment of these requirements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Cleaning manual 1 INTRODUCTION 2 1 Technical specifications 2 PLANNING Fig 1 External dimensions...

Page 4: ...çade Forces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Guarantees long term stability Avoid the usage of different metals to prevent contact corrosions Allows for stress free expansion and contraction due to temperature fluctuations Ä Ä Ensure that no mechanical stresses e g caused by vibrations twisting or expansion are generate...

Page 5: ...amp Subconstruction Mounting profile TYPE OF INSTALLATION MODULE TYPE LONG SIDE SHORT SIDE INSTALLATION WITH CLAMPS Q PRIME L G5 1 Q POWER L G5 1 INSTALLATION ON MOUNTING POINTS Q PRIME L G5 1 Q POWER L G5 1 INSTALLATION WITH INSERTION PROFILES Q PRIME L G5 1 Q POWER L G5 1 CL1 246 493 FB1 4 mounting slots 332 EN IP1 IP2 CL3 0 248 EU IP1 IP2 2 3 Mounting options 2 PLANNING TYPE OF INSTALLATION MOD...

Page 6: ...ower class Safety Factor During normal operation a module may generate a greater current and or higher voltage than that determined under standardized test conditions Please use a safety factor of 1 25 for the following Calculating the voltage measurement values Voc of components Calculating the current measurement values ISC of conductors Sizing of control systems connected to the outlets of the ...

Page 7: ...ol and dry rooms The packaging is not weatherproof DANGER Risk of fatal injury due to electric shock Ä Ä Do not install damaged modules Ä Ä Inform your distributor of any damages immediately 3 1 Safety and transport 3 INSTALLATION NOTE Module damage may occur Ä Ä Never lift or move the module with the connection cables or junction box Ä Ä Carry modules upright and horizontally as shown NOTE Module...

Page 8: ... shock Ä Ä Only use dry insulated tools Ä Ä Do not carry out the installation alone Only install undamaged modules and components Ä Ä Do not modify the module e g do not drill any additional holes 3 2 Preparation of installation 3 INSTALLATION Ä Ä Maintain an interval of at least 10 mm between two modules along the short side and 5 mm along the long side 10 mm 5 m m EU Option 2 Ä Ä Install the mod...

Page 9: ...verter prior to separation Ä Ä Be sure to observe the specified time intervals after switching off the inverter High voltage components need time to discharge DANGER Risk of fatal injury due to electric shock Ä Ä Never open the junction box Ä Ä Change of bypass diodes is only allowed by qualified and trained personnel in disconnected and covered state DANGER Risk of fatal injury due to electric sh...

Page 10: ...atal injury due to electric shock Ä Ä Ensure that all electrical components are in a proper dry and safe condition 4 3 Connection of modules 4 ELECTRICAL CONNECTION The 60 cell modules with min 1 000mm and for the 72 cell modules with min 1 200mm long cable in portrait orientation can be wired as a 2nd next neighbor 2nd next neighbor Wiring without a return cable Standard wiring with a return cabl...

Page 11: ...modules by yourself Ä Ä Please contact an installer or Q CELLS Technical Customer Service Department Ä Ä Dispose of modules in accordance with the local disposal regulations Ä Ä The symbols on the products packaging and or accompanying documents mean that end of life photovoltaic modules should not be mixed with general household waste For proper treatment recovery and recycling of end of life pho...