background image

4

5

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.POWER-G5 / L-G5 • Q.PRIME-G5 / L-G5 – EN

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.POWER-G5 / L-G5 • Q.PRIME-G5 / L-G5 – EN

Validity

These instructions are only valid for crystalline solar 
modules from the company Q CELLS. Q CELLS assumes 
no liability for damage resulting from failure to observe 
these instructions. 

 

Ä

Please observe the wiring and dimensioning of the 
system.

 

Ä

The installer of the system is responsible for compliance 
with all necessary safety regulations during set-up and 
installation.

Q CELLS assumes no liability on the basis of these 
instructions. Q CELLS is only liable in the context of 
contractual agreements or in the context of accepted 
guarantees. Q CELLS accepts no other responsibility for 
the functionality and safety of the modules. 

 

Ä

Please observe the instructions for any other sys-
tem components that may be part of the complete  
solar power system. It may be necessary to carry out a 
structural analysis for the entire project. 

Additional information for the Operator

 

Ä

Please keep this manual for the entire life of the solar 
power system.

 

Ä

Please contact your system supplier for information 
concerning the formal requirements for solar power 
systems.

 

Ä

Please be sure to contact the relevant local authorities 
and energy providers regarding regulations and permit 
requirements prior to installation of the solar power 

system. Your financial success depends on the fulfillment 

of these requirements. 

Other applicable documents

In addition to this Manual following technical information 
are relevant:

DOCUMENT TYPE

Product data sheet

Packaging and transport information

Cleaning manual

1 INTRODUCTION

2.1  Technical specifications

2 PLANNING

Fig. 1: 

External dimensions (in mm) and components for Q.PRIME L-G5.1, Q.POWER L-G5.1

C-SI MODULES (L) FOR DATA SHEETS

EN

≥ 

1200 mm

991mm

1308 mm

1972 mm

Junction bo×

4 × Mounting slots (DETAIL A)

8 × Drainage holes   

Cable with

connectors

Frame

4 × Grounding holes, Ø 4.5 mm

941 mm

4 × Drainage holes

332 mm

DETAIL A

16 mm

8.5 mm

25.5 mm

40 mm

Label

400 mm

4 × Mounting slots system Tracker (DETAIL B)

DETAIL B

10 mm

7 mm

25 mm

Additional information can be found in the currently valid data sheets available at www.q-cells.com.

PRODUCT LINE

Q.PRIME L-G5.1

Q.POWER L-G5.1

Type

Monocrystalline

Polycrystalline

Length

1972 mm

1972 mm

Width

991 mm

991 mm

Frame height

40 mm

40 mm

Weight

23 kg

23 kg

Max. system voltage V

SYS

 [V]

1000 (IEC) /  
1500 (IEC)

1000 (IEC) /  
1500 (IEC)

Max. fuse rating [A]

20

20

Permissible 

temperature range

–40 °C  to  +85 °C

Junction box protection class

IP67 or IP68, with bypass diodes

IP67 or IP68, with bypass diodes

Connector protection class

IP68

IP68

Fire protection class

C

C

Snow load

 

[Pa

1

]

5400

5400

Wind load

 

[Pa

1

]

2400

2400

Certificates

CE-compliant; IEC 61515 (Ed.2) see page 8; IEC 61730 (Ed.1)  
Application Class A

1

   Test-load in accordance with IEC 61215

12 mm

40 mm

35 mm

19.3 mm

L-G5.1

25.05 mm

8.5 mm

5.1 mm

Summary of Contents for Q.POWER L-G5.1

Page 1: ...Valid for Africa Asia Europe Latin America South America Q POWER G5 1 L G5 1 Q PRIME G5 1 L G5 1 SOLAR MODULES INSTALLATION AND OPERATION MANUAL ...

Page 2: ...maintenance and disposal Symbols and Labels The following symbols and labels are used throughout the Manual for ease of use SYMBOL DESCRIPTION Ä Ä Procedure with one or more steps Lists of items Ensure that when carrying out a pro cedure you check the results of said procedure Prohibited Beware of possible danger or damage Categories Danger Risk of fatal injury Attention Risk of serious injury or ...

Page 3: ...it requirements prior to installation of the solar power system Your financial success depends on the fulfillment of these requirements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Cleaning manual 1 INTRODUCTION 2 1 Technical specifications 2 PLANNING Fig 1 External dimensions...

Page 4: ...çade Forces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Guarantees long term stability Avoid the usage of different metals to prevent contact corrosions Allows for stress free expansion and contraction due to temperature fluctuations Ä Ä Ensure that no mechanical stresses e g caused by vibrations twisting or expansion are generate...

Page 5: ...amp Subconstruction Mounting profile TYPE OF INSTALLATION MODULE TYPE LONG SIDE SHORT SIDE INSTALLATION WITH CLAMPS Q PRIME L G5 1 Q POWER L G5 1 INSTALLATION ON MOUNTING POINTS Q PRIME L G5 1 Q POWER L G5 1 INSTALLATION WITH INSERTION PROFILES Q PRIME L G5 1 Q POWER L G5 1 CL1 246 493 FB1 4 mounting slots 332 EN IP1 IP2 CL3 0 248 EU IP1 IP2 2 3 Mounting options 2 PLANNING TYPE OF INSTALLATION MOD...

Page 6: ...ower class Safety Factor During normal operation a module may generate a greater current and or higher voltage than that determined under standardized test conditions Please use a safety factor of 1 25 for the following Calculating the voltage measurement values Voc of components Calculating the current measurement values ISC of conductors Sizing of control systems connected to the outlets of the ...

Page 7: ...ol and dry rooms The packaging is not weatherproof DANGER Risk of fatal injury due to electric shock Ä Ä Do not install damaged modules Ä Ä Inform your distributor of any damages immediately 3 1 Safety and transport 3 INSTALLATION NOTE Module damage may occur Ä Ä Never lift or move the module with the connection cables or junction box Ä Ä Carry modules upright and horizontally as shown NOTE Module...

Page 8: ... shock Ä Ä Only use dry insulated tools Ä Ä Do not carry out the installation alone Only install undamaged modules and components Ä Ä Do not modify the module e g do not drill any additional holes 3 2 Preparation of installation 3 INSTALLATION Ä Ä Maintain an interval of at least 10 mm between two modules along the short side and 5 mm along the long side 10 mm 5 m m EU Option 2 Ä Ä Install the mod...

Page 9: ...verter prior to separation Ä Ä Be sure to observe the specified time intervals after switching off the inverter High voltage components need time to discharge DANGER Risk of fatal injury due to electric shock Ä Ä Never open the junction box Ä Ä Change of bypass diodes is only allowed by qualified and trained personnel in disconnected and covered state DANGER Risk of fatal injury due to electric sh...

Page 10: ...atal injury due to electric shock Ä Ä Ensure that all electrical components are in a proper dry and safe condition 4 3 Connection of modules 4 ELECTRICAL CONNECTION The 60 cell modules with min 1 000mm and for the 72 cell modules with min 1 200mm long cable in portrait orientation can be wired as a 2nd next neighbor 2nd next neighbor Wiring without a return cable Standard wiring with a return cabl...

Page 11: ...modules by yourself Ä Ä Please contact an installer or Q CELLS Technical Customer Service Department Ä Ä Dispose of modules in accordance with the local disposal regulations Ä Ä The symbols on the products packaging and or accompanying documents mean that end of life photovoltaic modules should not be mixed with general household waste For proper treatment recovery and recycling of end of life pho...

Page 12: ...d Qidong City Jiangsu Province China TEL 86 0 5138360 6222 FAX 86 0 5138360 6376 EMAIL sales hanwha qcells com WEB www q cells com Subject to change without notice Hanwha Q CELLS Installation_Manual_Q POWER_Q PRIME_G5 1_L G5 1_module_series_2017 12_Rev02_EN ...

Reviews: