INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G9.2 – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G9.2 – Q CELLS

17

16

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Be sure to maintain the time intervals as 
specified by the inverter manufacturer between 
switching off the inverter and beginning any 
further work.

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Never plug or unplug the cable when under 
load. Modules must not carry any current.

1.

 Switch off the inverter.

OFF

EN

4  ELECTRICAL CONNECTION

4.2 ELECTRICAL INSTALLATION SAFETY

2.

 Switch off the DC circuit breaker.

3.

 Measure shutdown in DC String. 

(no DC current flow).

4.

 Disconnect plugs by the use of appropriate 

and qualified tools of the manufacturer.

5.

 When connecting the modules proceed in 

reverse order.

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Electrical work may only be performed by 
qualified and skilled personnel (see page 3).

 

Ä

Ensure correct polarity.

 

Ä

Use solar cables for the connection at the 
junction box outlet.

 

Ä

Only interconnect connectors of the same type and 
manufacturer.

 

Ä

Use minimum 4 mm

2

 copper wires insulated for 

a minimum of 90 °C for field connections.

Note! Module damage may occur!

 

Ä

Ensure that the cabling is not under mechanical 
stress (Comply with bending radius of ≥ 60 mm).

 

Ä

Ensure that the cables do not run between module 
and mounting rail or structure (danger of pinch).

 

Ä

Do not connect modules with different 
orientations or angles of inclination in the same 
string.

 

Ä

Ensure for a tight connection between the 
plugs. Plugs click together audibly.

EN

click

click

click

click

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Ensure that all electrical components are in a 
proper, dry, and safe condition.

SOLAR

4  ELECTRICAL CONNECTION

4.3 CONNECTION OF MODULES

Summary of Contents for Q.PEAK DUO XL-G9.2 Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G9 2 solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...pulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable...

Page 3: ...ents prior to installation of the solar power system Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and t...

Page 4: ...tural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures sufficie...

Page 5: ...he following clamp parameters clamp width 40mm and clamp depth 10mm The system installer is responsible for the determination of location specific load requirements Ensure that the subconstruction doe...

Page 6: ...n the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load...

Page 7: ...Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of...

Page 8: ...esult from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open ci...

Page 9: ...oceed in reverse order Danger Risk of fatal injury due to electric shock Electrical work may only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables fo...

Page 10: ...Modules must be cleaned manually and only with sufficient water Protective Grounding The modules must be grounded in accordance with the local statutory regulations DANGER Risk of fatal injury due to...

Page 11: ...ectrically conductive parts WARNING Risk of falling due to unsecured access Never access the installation area alone or without taking adequate security precautions Please commission a trade specialis...

Page 12: ...manual solar modules Q PEAK DUO XL G9 2_2020 12_Rev01_AU HANWHA Q CELLS AUSTRALIA PTY LTD Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia TEL 61 0 2 9016 3033 FAX 61 0 2 9016 3032 EMAIL...

Reviews: