Q CELLS Q.PEAK DUO BLK-G5 series Installation And Operation Manual Download Page 2

2

3

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – HANWHA Q CELLS – NA

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – HANWHA Q CELLS – NA

Document Revision 01
This Installation Manual is valid for North America as of July 1

st

 2017 for Q.PEAK DUO-G5.X and Q.PEAK DUO BLK-G5.X solar modules, and replaces all  

earlier versions. 

This manual is subject to change. The data sheets and customer information valid at the point in time when the relevant module was manufactured apply to the 
installation, mounting, and maintenance procedures for the respective solar modules, as far as no updated document is provided.

With solar modules from Hanwha Q CELLS (hereafter referred to as 
"Q CELLS") you can directly transform the sun’s limitless energy into 
environmentally-friendly solar electricity.

In order to ensure the maximum performance of your Q CELLS solar 
modules, please read the following instructions completely and care-
fully and observe all guidelines. Non-compliance may result in damage 
and/or physical injury.

This installation manual provides instructions for the safe installa-
tion of crystalline solar modules.

 

Ä

Please read these instructions carefully before proceeding with 
your installation.

 

Ä

Please retain these instructions for the life of the solar modules.

 

Ä

Please ensure that this installation manual is available to the 
operator at all times.

 

Ä

This installation manual should be given to all subsequent owners 
or users of the solar modules.

 

Ä

All supplements received from the manufacturer should be 
included.

 

Ä

Please observe all other applicable documents.

 

Ä

If your questions are not satisfactorily answered in the 
manual, please contact your system supplier. 

Additional information can be found on our website  
at www.q-cells.com. 

Intended Use

This manual is valid in North America for Q CELLS solar modules. 
These instructions contain information regarding the safe handling 
and use of quality crystalline solar modules from Q CELLS and their 
installation, mounting, wiring, and maintenance. 

Symbols and Labels

The following symbols and labels are used throughout the 
installation manual for ease of use. 

SYMBOL

DESCRIPTION

 

Ä

 

Procedure with one or more steps. 

• 

 

Lists of items

Ensure that when carrying out a pro-
cedure, you check the results of said 
procedure.
  

Prohibited.
 

Beware of possible danger or damage. 
Categories:

• 

Danger: Risk of fatal injury

• 

Attention: Risk of serious injury 
or damage to property

• 

Note: Risk of damage to product

Units

Where both Imperial and U.S. units (for example inches) are shown, 

metric units are definitive. References to “Data Sheet” or “Module 
Data Sheet” refer to the Module Data Sheet applicable to the module 

being used.

Safety Regulations

The installer and solar module operator are responsible for 
compliance with all applicable statutory requirements and 
regulations. 

 

Ä

The following regulations and standards must be upheld at all 
times during the installation, operation, and maintenance of the 
solar modules: 

• 

Installation and Operation Manual.

• 

Other applicable documents (such as country-specific regulations 

for pressure equipment, operational safety, hazardous goods, 
and environmental protection).

• 

Regulations and requirements specific to the system.

• 

Applicable country-specific laws, regulations, and provisions 

governing the planning, installation, and operation of solar 
power systems and work on roofs.

• 

Valid international, national, and regional regulations governing 
work with direct current, especially those applicable to the 
installation of electrical devices and systems, and regulations 
issued by the respective energy provider governing the parallel 
operation of solar power systems.

• 

Accident-prevention regulations.

Certified Personnel

Both, the operator and installer are  responsible for ensuring 
that the installation, maintenance, connection to the grid, and 

dismantling  are  carried  out  by  trained  and  qualified  electricians 
and engineers with approved training certificates (issued by a state 

or federal organization) for the respective specialist trade.

Electrical  work  may  only  be  performed  by  an  officially  certified 

tradesperson in accordance with the applicable safety standards, 
accident prevention regulations, and the regulations of the local 
energy provider.  

TABLE OF CONTENTS

1  INTRODUCTION  

3

2 PLANNING  

5

2.1  Technical specifications 

 

5

2.2 Requirements 

 

6

2.3  Mounting options  

7

2.4  Electrical layout  

9

3 INSTALLATION 

 

10

3.1  Safety and transport  

10

3.2  Preparation of installation  

12

3.3  Module installation  

13

4  ELECTRICAL CONNECTION  

14

4.1 Safety 

 

14

4.2  Electrical installation safety  

15

4.3  Connection of modules  

16

4.4  After installation  

17

5 GROUNDING 

 

18

6  FAULTS AND DEFECTS  

19

7 DISPOSAL 

 

19

8  MAINTENANCE AND CLEANING  

20

1 INTRODUCTION

Summary of Contents for Q.PEAK DUO BLK-G5 series

Page 1: ...Valid for North America Q PEAK DUO G5 X SOLAR MODULE SERIES INSTALLATION AND OPERATION MANUAL ...

Page 2: ...ou check the results of said procedure Prohibited Beware of possible danger or damage Categories Danger Risk of fatal injury Attention Risk of serious injury or damage to property Note Risk of damage to product Units Where both Imperial and U S units for example inches are shown metric units are definitive References to Data Sheet or Module Data Sheet refer to the Module Data Sheet applicable to t...

Page 3: ... of accepted guarantees Q CELLS accepts no other responsibility for the functionality and safety of the modules Ä Ä Please observe the instructions for any other system components that may be part of the complete solar power system It may be necessary to carry out a structural analysis for the entire project Ä Ä If your questions are not satisfactorily answered in the manual please contact your sy...

Page 4: ...ar ventilation of the module Guarantees long term stability Avoid of different metals to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ä Ä Ensure that no mechanical stresses e g caused by vibrations twisting or expansion applied to on the module Ä Ä Ensure that the clamps and the mounting frame are compatible Clamp System Requirements Us...

Page 5: ...r of parallel connected strings Without undertaking further current blocking measures a maximum of two module strings may be operated in parallel on a single inverter or MPP tracker 2 Layout with string fuses Place fuses for each string of modules at the plus and minus ends Observe the maximum permitted number of strings as indicated in the specifications provided by the respective string fuse man...

Page 6: ...ely in cool and dry rooms The packaging is not weatherproof DANGER Risk of fatal injury due to electric shock Ä Ä Do not install damaged modules Ä Ä Inform your vendor of any damages immediately 3 1 Safety and transport 3 INSTALLATION NOTE Module damage may occur Ä Ä Do not drop modules NOTE Module damage may occur Ä Ä Only make modifications to the module which have been confirmed in writing by Q...

Page 7: ...insulated tools Ä Ä Do not carry out the installation alone Only install undamaged modules and components Ä Ä Do not modify the module e g do not drill any additional holes 3 2 Preparation of installation 3 INSTALLATION Ä Ä Maintain an interval of at least 0 39 in 10 mm between two modules along the short side and 0 20 in 5 mm along the long side 0 39 in 10mm 0 2 0 i n 5 m m Option 2 Ä Ä Install t...

Page 8: ...rvals specified by the inverter manufacturer after switching off the inverter DANGER Risk of fatal injury due to electric shock Ä Ä Never open the junction box Ä Ä Do not remove bypass diodes DANGER Risk of fatal injury due to electric shock Ä Ä Never touch live contacts with bare hands Ä Ä Cover connectors by suitable protective caps until installation DANGER Risk of fatal injury due to electric ...

Page 9: ...nd safe condition 4 3 Connection of modules 4 ELECTRICAL CONNECTION Ä Ä To avoid complex cabling arrangements it is often advantageous to rotate some modules 180 Ä Ä Module orientation can clearly be identified from the front side by the serial number and barcode labelled behind the module glass on the side with negative connection cable Inverter 180 180 Ä Ä Ensure that all necessary safety and fu...

Page 10: ...ductor Aluminum Frame Screw Stainless Steel are marked with a ground symbol as shown below on the frame section drawing To install the grounding lug follow the specified instructions of the manufacturer The grounding lug should be made of stainless steel or tin plated metals such as aluminum to avoid corrosion The grounding lug should be attached to the frame grounding hole using a stainless steel...

Page 11: ...ve cooled down Ä Ä Do not carry or wear any electrically conductive parts WARNING Risk of falling due to unsecured access Ä Ä Never access the installation area alone or without taking adequate security precautions Ä Ä Please commission a trade specialist NOTE Module surface damage may occur Ä Ä Remove snow and ice without force e g with a very soft broom Ä Ä Do not scratch off dirt Ä Ä Rinse dirt...

Page 12: ...C 300 Spectrum Center Drive Suite 1250 Irvine CA 92618 USA TEL 1 949 748 59 96 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Hanwha Q CELLS Installation manual solar modules DUO G5 X_2017 10_Rev01_NA ...

Reviews: