background image

14

15

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G9.2 – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G9.2 – Q CELLS

15

14

Option 1:

 

Ä

Fasten the module with 4 clamps in the 
specified clamping range, see Fig. 2, p. 7.

 

Ä

Tighten clamps according to 
manufacturer’s instructions.

 

Ä

Maintain an interval of at least 10 mm between 
two modules along the short side and 5 mm 
along the long side.

10 mm

5 mm

EU

Note! Module damage may occur!

 

Ä

Do not subject modules to mechanical tension. 
Max. torsion 10 mm/m.

Option 2:

 

Ä

Install the module at the 4 mounting points, 
see Fig. 2, p. 7.

 

Ä

Tighten screws according to 
manufacturer’s instructions.

Option 3:

 

Ä

Install the module using mounting profiles, 
see Fig. 2, p. 7.

3  INSTALLATION

3.3 MODULE INSTALLATION

DANGER! 
Risk of fatal injury due to electric shock!

When disconnecting an electric circuit carrying direct current, 
electric arcs can occur that may result in life-threatening injuries.

 

Ä

Do NOT unplug the cable when under load.

 

Ä

Do NOT connect any exposed cable ends.

 

Ä

Electrical work may only be performed by qualified and 
skilled personnel (see page 3).

A solar module generates electrical current and voltage even 
at a low intensity of illumination. Sparks and electric arcs may 
result from the separation of a closed circuit. These can result 
in life-threatening injuries. The danger increases when several 
modules are connected in series.

 

Ä

Please be aware of that the entire open circuit voltage is 
active even at low levels of solar irradiation.

 

Ä

Please follow the valid national regulations and safety guidelines 
for the installation of electrical devices and systems.

 

Ä

Please make sure to take all necessary safety precautions. 
With module or phase voltages of more than 120 V, the safety 
extra-low voltage range is exceeded.

 

Ä

Carry out work on the inverter and the wiring with extreme 
caution.

 

Ä

Ensure that the modules are disconnected at the inverter 
prior to separation.

 

Ä

Be sure to observe the time intervals specified by the inverter 
manufacturer after switching off the inverter.

 

Ä

Make sure that the plugs can not be connected unintentionally.

 

Ä

Before working on the contacts, check them for safety extra-low 
voltage.

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Never open the junction box.

 

Ä

Do not remove bypass diodes.

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Never touch live contacts with bare hands.

 

Ä

Cover connectors by suitable protective caps 
until installation.

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Insulate any exposed cable ends.

 

Ä

Only connect cables with plugs.

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Only use dry, insulated tools for electrical 
work.

4  ELECTRICAL CONNECTION

4.1  SAFETY

Summary of Contents for Q.ANTUM DUO Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G9 2 solar module series Valid for Africa Europe LatinAmerica South America ...

Page 2: ...icable stipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and stipulations governing the planning installation and operation of solar power systems and work on roofs...

Page 3: ...equirements prior to installation of the solar power system Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE THIS INCLUDES IMPROPER INSTALLATION OR CONFIGURA...

Page 4: ...y structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the façade Forces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ä Ensure that...

Page 5: ...ollowing clamp parameters clamp width 40mm and clamp depth 10mm The system installer is responsible for the determination of location specific load requirements Ä Ensure that the subconstruction does not touch the junction box even under load The clamps or insertion profiles etc must also not touch the glass even under load Ä CL1b Using of short mounting rails are permissible Minimum height of the...

Page 6: ...string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ä Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reverse currents that may occur we recommend using the following safety options 1 Layout with a limited number of parallel connected strings ...

Page 7: ...e Module damage may occur Ä Never step on modules Ä Do not subject modules to any mechanical stress Ä Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of fatal injury due to electric shock Ä Block off the installation zone Ä Keep children and unauthorized individuals away from the solar power system Danger Risk of fatal injury due to electric shock ...

Page 8: ...t from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Ä Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation Ä Pleasefollowthevalidnationalregulationsandsafetyguidelines for the installation of electrical devices and systems Ä Please make sure to ...

Page 9: ...n reverse order Danger Risk of fatal injury due to electric shock Ä Electrical work may only be performed by qualified and skilled personnel see page 3 Ä Ensure correct polarity Ä Use solar cables for the connection at the junction box outlet Ä Only interconnect connectors of the same type and manufacturer Ä Use minimum 4mm2 copper wires insulated for a minimum of 90 C for field connections Note M...

Page 10: ...odules must be cleaned manually and only with sufficient water Protective Grounding Ä The modules must be grounded in accordance with the local statutory regulations DANGER Risk of fatal injury due to electric shock Ä Do not attempt to fix any problems yourself e g glass cracks damaged cables Ä Please contact an installer or Q CELLS Technical Customer Service Department Ä Do not disconnect modules...

Page 11: ...cally conductive parts WARNING Risk of falling due to unsecured access Ä Never access the installation area alone or without taking adequate security precautions Ä Please commission a trade specialist NOTE Module surface damage may occur Ä Remove snow and ice carefully without force e g with a very soft broom Ä Do not scratch off dirt Ä Rinse dirt dust leaves etc off with lukewarm water or use onl...

Page 12: ... manual solar modules Q PEAK DUO XL G9 2_2020 12_Rev01_AU HANWHA Q CELLS AUSTRALIA PTY LTD Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia TEL 61 0 2 9016 3033 FAX 61 0 2 9016 3032 EMAIL q cells australia q cells com WEB www q cells com au ...

Reviews: