
P
USH
C
ORP,
I
NC.
AFD92
Manual
19
8.0 Preventative Maintenance Schedule
It is highly recommended to adhere to the preventative maintenance schedule in order help
extend the longevity of the specified PushCorp, Inc. equipment. Failing to do so could cause a
loss in functionality as well as a decrease in product life.
PUSHCORP, INC. AFD
Maintenance
Weekly
Monthly 3 Months
Remove debris from AFD
X
Check that the connectors are not bent/damaged
X
Check to see if the carriage moves back and forth
easily
X
Check for flow in the purge and supply ports
X
Agency/Organization:_________________________________________________
Date Completed:_____________________________________________________
Copyright
PushCorp, Inc.
2006. All rights reserved