12
B. Drain Clamp Assembly
1
2
3
1.Drill a 6mm hole on the existing drain pipe.
2.Tighten the drain clamp evenly on both sides.
3.
Refer to p.10 .
Connect the PE tube and complete the drain clamp
assembly.
C. Storage Tank Assembly
1
2
1.Connect the PE tube to the quick connector.
2. Refer to p.10
. Connect the other end of the PE tube to the filter unit’s
“to tank” outlet.
※
How quick connectors work can refer to p.5
.
Summary of Contents for CT8
Page 1: ...RO DRINKING SYSTEM CT8 USER MANUAL Standard 5 Stage Version ...
Page 2: ......
Page 10: ...7 FLOW CHART OUT IN 1 2 3 TANK Drain Shut off Valve RO Feed Water In To Faucet 5 4 ...
Page 13: ...10 INSTALLATION DIAGRAM B D A A D C B B C C Feed Water Drain Pressure Tank Pure Water ...
Page 23: ...20 DEMO ...
Page 24: ...2015 12 D010123001 ...