Installation Procedure
4. Drill the holes and install the anchors. (Fixing anchors not included)
5. Position the Hybrid-R Triple system on the wall. Insert and tighten the fixings to hold
the system securely to the wall. This unit can be installed from left to right or right
to left depending on the water supplies point of entry.
Note: The outlet is always on the UV side of the system.
6. Turn the water off and purge the lines.
7. Plumb inlet and outlet pipe work to the Hybrid-R Triple unit. The inlet is a 25mm
female and the outlet is a 25mm male.
Note: Use thread seal tape, do not use liquid sealants. Never connect PVC pipe directly to
the unit. The outlet pipe work within 1 metre should
be metal or polyethylene.
8. Secure the ballast firmly onto the Hybrid-R
Triple bracket with the fasteners provided.
Connect the power cord to the ballast.
9. Insert the lamp spring through the hole of the
aluminium nut end (
see fig. 9-1
).
10. Slowly insert UV lamp into chamber through
the hole of the aluminium nut end. Connect the
lamp connector to the pins on the lamp. Do not
let go of the lamp until the lamp is connected to the socket (
see fig. 9-2
).
Never touch the quartz (glass) and lamp surface as marks or fingerprints may
interfere with UV transmission. If lamp is soiled, please clean lamp with an alcohol
based cleaner.
12. Put safety cap on the aluminium nut end. Connect the ground wire to the chamber.
Plug in power connector.
13. Use the provided spanner to tighten filter bowl until firm. DO NOT OVER TIGHTEN.
14. Turn the water on, let the water flow through – opening a tap downstream to flush
the unit for 1-2 minutes. Then check the system thoroughly for leaks.
Note: For initial use, wait 3-5 minutes to allow water to pass through the whole
unit. Turn on a downstream tap to let water flow through the unit for 2-3 minutes to
release air and impurities from the system.
15. Turn the power on and ensure that the lamp is operating. Make sure that the GREEN
LED is illuminated. (Refer lamp replacement procedure on pg.14).
Cleaning Quartz Sleeve
1
2
3
valve
IN
OUT
10
mins
4
5
6
Replacing UV Lamp
7
8
9
Replacing UV Lamp
valve
IN
OUT
1
2
3
4
5
O Ring
3
O Ring
Cleaning Quartz Sleeve
1
2
3
valve
IN
OUT
10
mins
4
5
6
Replacing UV Lamp
7
8
9
Replacing UV Lamp
valve
IN
OUT
1
2
3
4
5
O Ring
3
O Ring
Fig. 9-1
Fig. 9-2
Summary of Contents for HYBRID R10
Page 20: ......