Page
14
Preparat
Preparat
Preparat
Preparation for Operation
ion for Operation
ion for Operation
ion for Operation
Before switching on, check the following:
The
blackbox
is mounted correctly and is in a ‘safe’ area.
The power supply is correctly installed.
The voltage selector switch is in the correct position.
The relays are connected correctly.
Main
Main
Main
Maintenance
tenance
tenance
tenance
There are no user serviceable parts inside your
blackbox
, except the mains
power fuse. If you experience any problems with the unit, then please
contact Pulsar Process Measurement for advice.
To clean the equipment, wipe with a damp cloth. Do not use any solvents on
the enclosure.
Important Information
The unique DATEM software comes into operation as soon as power is
applied, and is designed to monitor a
moving level
or
target
with the
transducer
in a
fixed position.
If, after any period of use, it should become necessary to move the
transducer, for any reason, from its original operating position, switch off
the
blackbox
, before proceeding, to prevent any undesirable updates to the
DATEM trace. If after moving the transducer the reading is not as expected
please refer to
Chapter 6 Troubleshooting
.