![PSS Gared GP8A60DM Installation, Operation And Maintenance Instructions Download Page 7](http://html1.mh-extra.com/html/pss/gared-gp8a60dm/gared-gp8a60dm_installation-operation-and-maintenance-instructions_1623083007.webp)
Collegiate Jam Adjustable Basketball System
6
INSTALLATION
Tools and Materials Required for Assembly:
1.
(2) Adjustable Wrenches.
2.
¼”, ½”,
9
/
16
”,
11
/
16
”, ¾”,
15
/
16
, 1-
1
/
8
” Wrench
3.
Phillips Head Screwdriver
4.
Electric Drill
5.
11/64” Drill Bit
6.
Tape Measure
7.
Rubber Mallet
8.
Shovel
9.
Post Hole Digger.
10.
Carpenter’s Level
11.
(2) Ladders – minimum
12.
(2) Sawhorses
Materials Required for Assembly:
1.
Concrete –1/2 yard or 14-16 bags of pre-mix (80 lb. bags)