![PSS Gared GP8A60DM Installation, Operation And Maintenance Instructions Download Page 12](http://html1.mh-extra.com/html/pss/gared-gp8a60dm/gared-gp8a60dm_installation-operation-and-maintenance-instructions_1623083012.webp)
Collegiate Jam Adjustable Basketball System
11
Install Lifting Arm and Actuator
Follow the steps below to assemble the unit in the proper sequence. See the instructions on the
following pages for more detailed information.
1.
Install 16mm Flanged Bushing, #33, into Upper Arm
Pivot & Lifting Arm Pivot and Actuator Pivot Tubes,
#32. Bushings are designed to fit tightly and must be
tapped gently into place with a rubber mallet using a
5/8” bolt as a guide.
Tap on head of bolt to
insert Flanged Bushing.