![PSS Gared GP8A60DM Installation, Operation And Maintenance Instructions Download Page 17](http://html1.mh-extra.com/html/pss/gared-gp8a60dm/gared-gp8a60dm_installation-operation-and-maintenance-instructions_1623083017.webp)
Collegiate Jam Adjustable Basketball System
16
Level Goal
1.
Check the level of the bottom of the board. If
adjustments need to be made, loosen 3/8-16
Whiz Lock Nut, #34, and the 3/8” goal
hardware. Level board and retighten Whiz
Lock Nuts.
2.
Check the level of the Goal from side to
side. If adjustments need to be made,
loosen the (4) 3/8” goal nuts. Level Goal
and retighten.
3.
Be sure that all Board and Goal hardware
is tight. Install Goal Cover plate.
Apply Gared Decal
1.
Apply Gared Decal, #23, to each side of
Lifting Arm as shown.