Confidential - PSION INDUSTRIAL PLC
Workabout MX Service Manual
26
Version 1.0
Final Test
The section describes how to set up the Final Test and perform the test sequence on a
Workabout.
+
Note:-
These instructions do not describe how to perform tests on the Workabout
Peripheral product range.
Equipment
You need the following equipment to perform the Final Test:
Qty
Description
Psion p/no.
1
Workabout Final Test Unit
1810-0001
1
Mains Lead
4801-0005
2
Test SSDs
2301-0115
1
Workabout Test Battery Cartridge
2800-0030
1
LIF Cable
2800-0005
1
Lithium Battery
4900-0018
+
Note:-
The Final Test Unit is suitable for working with mains supplies in the range
90-130/180-260VAC @ 47-63Hz, without adjustment.
Test Setup
WARNING - There are hazardous voltages within the Final Test Unit. Please follow this
procedure carefully.
Follow the steps below to set up a Workabout for testing.
1
Insert the following items in the Workabout:
q
2 x test SSDs
q
1 x lithium battery
q
1 x Workabout Test Battery Cartridge
2
On the Final Test Unit:
a) Connect the LIF Cable and Ground Detect Probe to the Final Test Unit.
b) Set the main battery switch to STANDBY.
c) Set the DC Power switch to OFF.
Summary of Contents for Workabout MX
Page 1: ...Workabout MX Service Manual...
Page 2: ......
Page 6: ......
Page 36: ...Confidential PSION INDUSTRIAL PLC Workabout MX Service Manual 30 Version 1 0...