Confidential - PSION INDUSTRIAL PLC
Workabout MX Service Manual
Version 1.0
19
Step 3
Take care not to damage the Main Battery and Lithium Battery contacts.
Step 5
Ease the FFC into the case by sliding it backwards and forwards while pushing it gently down
through the insertion slot in the SSD Drawer moulding.
Re-assembling the Chassis Assembly
1
2
Fit the LCD on top of the Backlight.
Place the Backlight, if fitted, in position.
3
Fit the Chassis Seal.
4
Fit the Main PCB.
5
Connect the Backlight Power Connector.
6
Fit the Option Port FFC or Blank.
7
Add the Expansion or Monitor PCB, if
fitted.
8
Fit the Connector Block.
The Chassis Assembly has now been re-assembled.
11
Fit the Drawer Spring.
See Notes Step 1 below
See Notes Step 4 below
9
Fit the 2 LIF Connector Screws.
10
Fit a
new
Bottom Connector Seal.
Notes on Chassis Re-assembly
Step 1
Stick the LCD Backlight FFC to the side of the Chassis Assembly.
Step 4
Hold the Main PCB and Chassis Assembly parallel to each other and insert the LCD FFC into
the LCD ZIF Connector. Lock the ZIF Connector. Now fit the Main PCB Screw.
Summary of Contents for Workabout MX
Page 1: ...Workabout MX Service Manual...
Page 2: ......
Page 6: ......
Page 36: ...Confidential PSION INDUSTRIAL PLC Workabout MX Service Manual 30 Version 1 0...