
Harsco Industrial Patterson-Kelley ProtoNode Startup Guide
Page 3 of 38
ProtoCessor
1991 Tarob Court Milpitas, California 95035 USA
Web
: www.protocessor.com
Tel
: (408) 964 4444
Fax
: (408) 964 4425
Toll Free
: (800) 317 8319
TABLE OF CONTENTS
1
Introduction ................................................................................................................................................... 5
1.1
BTL Mark – BACnet Testing Laboratory ......................................................................................................... 5
1.2
LonMark Certification .................................................................................................................................... 5
2
BACnet/LonWorks Setup for ProtoNode RER/LER .......................................................................................... 6
2.1
Installation steps for the customer ................................................................................................................ 6
2.2
Record Identification Data ............................................................................................................................. 6
2.3
Configure the DIP Switches ............................................................................................................................ 6
2.3.1
Setting the Node/ID Device Instance (DIP Switch A0 – A7) for BACnet MS/TP, BACnet/IP, and Metasys
N2
……………………………………………………………………………………………………………………………………………………………6
2.3.2
Setting the Serial Baud Rate (DIP Switch B0 – B3) for BACnet MS/TP and Metasys N2 ProtoNodes ....... 7
2.3.3
Using S0 – S3 bank of DIP Switches to select and load Configuration Files for ENVI and Love Controller
……………………………………………………………………………………………………………………………………………………………7
3
Interfacing the ProtoNode to ENVI and Love Controller ............................................................................... 10
3.1
ProtoNode RER and LER component layout with the cover removed ......................................................... 10
3.2
Wiring Connections to ProtoNode RER and LER for the ENVI and Love Controller ..................................... 11
3.2.1
Connecting ENVI Modbus RTU Boilers to the ProtoNode’s RS-485 ........................................................ 12
3.2.2
Biasing the Modbus RS-485 Network..................................................................................................... 12
3.2.3
End of Line Termination Switch for the Modbus RS-485 port on the ProtoNode ................................... 13
3.3
Wiring the ProtoNode RER to RS-485 Field Protocol ................................................................................... 14
3.4
Wiring the ProtoNode LER Field Port to a LonWorks network .................................................................... 15
3.5
Power-Up the ProtoNode RER or LER .......................................................................................................... 15
4
Commissioning the ProtoNode LER on a LonWorks network ........................................................................ 16
4.1
Commissioning the ProtoNode LER on a LonWorks network ...................................................................... 16
4.1.1
Instructions to Upload XIF File From the ProtoNode LER Using FS GUI Web Server .............................. 16
5
Connect the ProtoNode’s Web GUI to Setup IP Address for BACnet/IP or Modbus TCP ............................... 18
5.1
Connect the PC to the ProtoNode via the Ethernet port ............................................................................. 18
5.2
Use the ProtoNode Web GUI to Connect to the ProtoNode ....................................................................... 19
5.3
Set IP Address for BACnet/IP or Modbus TCP via GUI ................................................................................. 19
6
Chipkin Automation’s CAS BACnet Explorer for validating the Protonode in the field on a BACnet MS/TP or
BACnet/IP network .............................................................................................................................................. 21
6.1
Downloading Chipkin Automation’s CAS Explorer and Requesting an Activation Key ................................ 21
6.2
CAS BACnet Setup ........................................................................................................................................ 22
6.2.1
CAS BACnet MS/TP Setup ....................................................................................................................... 22
6.2.2
CAS BACnet BACnet/IP Setup ................................................................................................................. 22
Appendix A. Troubleshooting Tips ....................................................................................................................... 23
Appendix A.1. Check Wiring and Settings ................................................................................................................ 23
Appendix A.2. Take Log With Our FieldServer Utilities............................................................................................ 23
Appendix A.3.
LED Diagnostics for Modbus RTU Communications between the ProtoNode and the ENVI and the
Love Controller ........................................................................................................................................................ 26
A.3.1 ProtoNode RER and LER LEDs .................................................................................................................... 26
Appendix B. Vendor Information ......................................................................................................................... 27
Appendix B.1. ENVI and Love Controller Modbus RTU COM Settings ..................................................................... 27
Appendix B.2. ENVI Modbus RTU Mappings to BACnet MS/TP, BACnet IP, Metasys and LonWorks ..................... 27
Appendix B.3. Love Controller Modbus RTU Mappings to BACnet MS/TP, BACnet IP, Metasys N2 ....................... 28