INSTALLATION OF THE DEVICE (Method of use no. 3 and 3B)
Order of installation
Before installing the device RJ200 prepare necessary tools as follows:
• Hammer
• Spirit level
• Combination open-end wrenches 19mm (2 pcs.)
List of elements:
3
Gniazdo tracone
(Housing tube)
1
PVC
RJ200.05.000-B
2.125
2
Gniazdo (Socket)
1
S235 (steel)
RJ200.05.000
76.400
1
Ramię (Arm)
1
S235 (steel)
RJ200.06.000
65.000
Nr. częś.
(Part No.)
Nazwa części /
zespołu
(Part / Assembly
name)
Sztuk
(pcs).
Materiał (Material)
Nr rys. / Nr
normy
(Drawing No /
Standard No)
Ciężar [kg]
(Weight)
Uwagi
(Notice)
1. Mount socket “2” or loosen socket “3” in “wet concrete”.
Socket mounting depth is min. 1000mm. Minimum requirements for concrete (beam) are
given in the figure.
Plumb the mounted socket. Maximum deviation angle from the vertical cannot exceed 2°.
2. Wait until concrete reaches its required strength. Protect the hole where the socket is
mounted against any contamination.
4. Mount rotary arm “1” in the previously mounted socket “2”.
5. The socket can be used several times by moving the arm between sockets.
6. After all works employing the arm are completed:
- socket “2” can be cut off and poured out with concrete
- loosen socket “3” can be poured out with concrete
Method of use no. 3
Method of use no. 3B
Concrete min. B20