![Promise Technology E610f Quick Start Manual Download Page 2](http://html1.mh-extra.com/html/promise-technology/e610f/e610f_quick-start-manual_1617181002.webp)
VTrak Quick Start Guide
2
VTrak Setup Task List
Task 1: Unpacking the VTrak (below)
Task 2: Mounting VTrak in a Rack (page 3)
Task 3: Making Management and Data Connections (page 5)
Task 4: Powering On the System (page 8)
Task 5: Initial Setup (page 9)
Task 6: Configuring the VTrak (page 12)
For complete information about your VTrak E610f and J610s subsystems, see
their respective
VTrak Product
(user)
Manuals
on the Software CDs.
Task 1: Unpacking the VTrak
The VTrak box contains the following items:
•
VTrak Unit
•
Quick Start Guide
•
Left and right center-mount
brackets
•
Left and right mounting rails
•
RJ11-to-DB9 serial data cable
•
1.5m (4.9 ft) Power cords (2)
•
CD with SNMP files,
Product
(user)
Manual
and
Quick Start Guide
Warning
The electronic components within the VTrak disk array are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VTrak or its subassemblies.
Caution
At least two persons are required to safely lift the VTrak
subsystem from the box and place it into a rack.
Important
Use the following categories of network cables with VTrak:
•
Cat 6, preferred
•
Cat 5E, minimum
Summary of Contents for E610f
Page 18: ...VTrak Quick Start Guide 18...