
31. Connect a Ø40 mm PVCU line to the brine tank and to the
sewerage system as an overflow line. There should be salt in
the brine tank once the PVCU lines have been connected.
32. Connect the level switch of the brine tank:
Connect the cables to terminal strip X1-4:
n
The brown cable to the top row of the terminal strip
n
The blue cable to the bottom row of the terminal strip.
Do not remove the jumpers in the terminal strips!
33. Remove the pH sensor from its transparent tubular housing
and fit it into the sensor straight union on the system.
Installation and assembly
30