9
7.
Point the
front
true
south, as this direction provides the
most sunlight during the day. If you need information on how to
find
true
south for your location please visit
http://www.solaripedia.com/files/447
and use the chart
provided below.(See Figure 6)
8.
Insert the provided ¼” by 2” lag bolts through the pre
drilled holes in the Z bracket and attach to the roof
trusses.(Optional – you can pre-drill the bolt locations with a
1/8”- 3/16” drill bit)
9.
Remove the zip ties on the 30' cord and plug the GT into a
dedicated
outdoor weatherproof outlet like the one shown
below. (See Figure 8)
WARNING! Ensure there are no other
electrical loads connected to the circuit your GT is plugged into.
Connecting loads to this circuit may result in fire or damage to
the circuit. Refer to the “IMPORTANT SAFETY INFORMATION” in
this manual for more details.
10.
After an
NEC required five minute wait period
, your GT
will sync with the utility grid and begin producing clean electricity
for your home. You can now use the included wireless monitor
to analyze the performance of your GT. (See Figure 9) Please
refer to the included ELITE Wireless Electricity Monitor quick
start guide for information on how to set up and use your
wireless monitor.