ASSEMBLY
4
2
2
30
24
33
37
30
1
30
39
5
39
1
Square
Holes
38
2. Hold the Handlebar Post (2) near the Frame (1) as
shown. Connect the Extension Wire (37) to the
Reed Switch Wire (33). Next, carefully slide the
Handlebar Post down into the Frame. Be careful
not to pinch the Extension Wire or the Reed
Switch Wire. Secure the Handlebar Post with eight
M4 x 16mm Tapping Screws (30).
Next, press the Resistance Knob (25) onto the end
of the Resistance Cable (24). Slide the Resistance
Cable into the slotted tab on the Handlebar Post (2);
make sure that the Resistance Cable is turned
as shown. Firmly push down on the Resistance
Knob until the end of the Resistance Cable is fully
seated in the slotted tab.
3
4
3
14
39
2
Place all parts of the exercise cycle in a cleared area and remove the packing materials. Do not dispose of the
packing materials until assembly is completed. Assembly requires the included allen wrench ,
a phillips screwdriver , and two adjustable wrenches .
1. Hold one of the Stabilizers (5) against the Frame
(1), with the square holes facing away from the
Frame. Attach the Stabilizer with two M8 x 65mm
Carriage Bolts (38) and two M8 Nylon Locknuts
(39).
Attach the other Stabilizer (not shown) in the same
manner.
3. Slide the bottom of the Left Handlebar (3) into the
Handlebar Post (2). Be sure that the holes in the
Handlebar and the Handlebar Post line up. Attach
the Handlebar with two M8 x 36mm Button Head
Bolts (14) and two M8 Nylon Locknuts (39).
Attach the Right Handlebar (4) in the same manner.
25
Slotted Tab
1