10
Step 5.
Step 6.
Step 7.
Tie a piece of string onto the REED
SWITCH WIRE (49), see Detail, and in-
sert string up through the HANDLEBAR
POST (5).
Holding the string, slide the HANDLE-
BAR POST (5) into FRAME (1), with
adjustment holes facing front, and lock
at desired height by threading LOCK-
ING LEVER HANDLE (26) into FRAME
(1) until tight.
Pull plug of REED SWITCH WIRE (49)
through hole at top of HANDLEBAR
POST (5).
FIGURE 2 - ASSEMBLY
49
FIGURE 2
DETAIL
1
26
Step 8.
Step 9.
Attach HANDLEBAR (6) to HANDLE-
BAR POST (5) with M8 x 15mm BOLTS
(33) and M8 SPRING WASHERS (39).
Plug EXTENSION WIRE (48) into REED
SWITCH WIRE (49), see Detail.
FIGURE 3 - ASSEMBLY
33
DETAIL
39
5
6
FIGURE 3
48
49
5
Model CTE2000E Children’s Circuit Training & Spinning Combo Bike